2024-05-17 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help
Work Item Progress Report: All Active Work Items For Current Status: From 'Creation of WI by WG/TB' Up to 'End of pre-processing' Matching One of The Keywords 'GSM'
View As Work Item Summary List  |  View As Work Item Plan    
Legend:   On Time   Late
  Found 151 Items...
Displaying items 1 to 10 ...
  Work Item Title Current Status Planned Next Status Planned Procedure
MSG TFES
1. EN 302 480
REN/MSG-TFES-1138
Mobile Communication On Board Aircraft (MCOBA) systems;
Harmonised Standard for access to radio spectrum
MCOBA/NCU 5G-NR HS
2024-05-03
Resume work
2024-06-25
EC assessment before AP requested
2024-10-19
AP
2. EN 301 908-18
REN/MSG-TFES-1502
IMT cellular networks;
Harmonised Standard for access to radio spectrum;
Part 18: NR, E-UTRA, UTRA and GSM/EDGE Multi-Standard Radio (MSR) Base Station (BS) Release 17
3GPP Rel-17 update
2024-03-28
Stable draft
2024-06-24
Mature draft sent to EC and/or recog.Org
2024-10-19
AP
MSG
3. EN 301 511
REN/MSG-001126
Global System for Mobile communications (GSM); Mobile Stations (MS) equipment;
Harmonised Standard for access to radio spectrum
Update a MU value in HS for GSM MS
2018-04-17
Waiting - see "Remarks"
2024-09-22
Stop this Work Item
2024-10-20
AP
ERM WGEMC
4. EN 301 489-52
REN/ERM-EMC-420
ElectroMagnetic Compatibility (EMC) standard for radio equipment and services;
Part 52: Specific conditions for Cellular Communication User Equipment (UE) radio and ancillary equipment;
Harmonised Standard for ElectroMagnetic Compatibility
EMC for User Equipment
2024-04-10
EC Assessment Received

Final draft for approval
2024-10-28
AP
5. EN 301 489-50
REN/ERM-EMC-410
ElectroMagnetic Compatibility (EMC) standard for radio equipment and services;
Part 50: Specific conditions for Cellular Communication Base Station (BS), repeater and ancillary equipment;
Harmonised Standard for ElectroMagnetic Compatibility
EMC for Cellular Communication BS, repeater and ancillary equipment
2024-02-20
Stable draft
2023-10-13
Mature draft sent to EC and/or recog.Org
2024-03-27
AP
EE EEPS
6. ES 203 228
RES/EE-EEPS69
Environmental Engineering (EE);
Assessment of mobile network energy efficiency
Update of ES 203 228 (TA-ITU L.1331)
2024-04-28
Early draft
2025-03-17
Stable draft
2025-07-04
MV
7. ES 202 706-1
RES/EE-EEPS70
Environmental Engineering (EE);
Metrics and measurement method for energy efficiency of wireless access network equipment;
Part 1: Power consumption - static measurement method
Energy efficiency of wireless access network equipment -Static
2024-04-27
Final draft for approval
2024-06-21
TB approval
2024-07-19
MV
3GPP SA 5
8. TS 152 402
RTS/TSGS-0552402vi00
Digital cellular telecommunications system (Phase 2+) (GSM);
Telecommunication management; Performance Management (PM); Performance measurements - GSM
(3GPP TS 52.402 version 18.0.0 Release 18)
Telecommunication management; Performance Management (PM); Performance measurements - GSM
2024-04-23
Draft receipt by ETSI Secretariat

Publication

PU
9. TS 152 008
RTS/TSGS-0552008vi00
Digital cellular telecommunications system (Phase 2+) (GSM);
Telecommunication management; GSM subscriber and equipment trace
(3GPP TS 52.008 version 18.0.0 Release 18)
Telecommunication management; GSM subscriber and equipment trace
2024-04-23
Draft receipt by ETSI Secretariat

Publication

PU
3GPP CT 6
10. TS 151 013
RTS/TSGC-0651013vi00
Digital cellular telecommunications system (Phase 2+) (GSM);
Test specification for Subscriber Identity Module (SIM) Application Programming Interface (API) for Java Card
(3GPP TS 51.013 version 18.0.0 Release 18)
Test specification for Subscriber Identity Module (SIM) Application Programming Interface (API) for
2024-04-10
Draft receipt by ETSI Secretariat

Publication

PU
  Found 151 Items...
Displaying items 1 to 10 ...

Display Items/Page

New Query

ETSI Home Page Any comments or problems with this application? Please let us know...