2024-07-03 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help
Work Item Progress Report: All Active new Work Items of Type 'EN' For Current Status: From 'Creation of WI by WG/TB' Up to 'WI proposed to WG'
View As Work Item Summary List  |  View As Work Item Plan    
Legend:   On Time   Late
  Found 5 Items...
Displaying items 1 to 5 ...
 
  Work Item Title Current Status Planned Next Status Planned Procedure
ESI
1. EN 319 412-5
REN/ESI-0019412-5v251
Electronic Signatures and Trust Infrastructures (ESI);
Certificate Profiles;
Part 5: QCStatements
QCStatements
2024-06-19
TB adoption of WI
2024-07-05
Start of work
2024-11-25
AP
MSG TFES
2. EN 301 908-27
DEN/MSG-TFES-1511
IMT cellular networks;
Harmonised Standard for access to radio spectrum;
Part 27: New Radio (NR) Repeater Release 17
NR Repeater 17.1.1
2024-06-27
Work item adoption closed
2024-06-27
Work item adopted
2025-03-08
EV
3. EN 301 908-24
REN/MSG-TFES-1507
IMT cellular networks;
Harmonised Standard for access to radio spectrum;
Part 24: New Radio (NR) Base Stations (BS) Release 17
NR BS 3GPP Rel-17 update
2024-06-27
Work item adoption closed
2024-06-27
Work item adopted
2025-03-08
EV
4. EN 301 908-23
REN/MSG-TFES-1508
IMT cellular networks;
Harmonised Standard for access to radio spectrum;
Part 23: Active Antenna System (AAS) Base Station (BS); Release 17
AAS BS V17.1.1
2024-06-27
Work item adoption closed
2024-06-27
Work item adopted
2025-03-08
EV
ERM TGMARINE
5. EN 301 688
REN/ERM-TGMAR-635
Technical characteristics and methods of measurement for fixed and portable VHF equipment
operating on 121,5 MHz and 123,1 MHz
ixed and portable VHF equipment operating on 121,5 MHz and 123,1 MHz
2024-06-19
TB adoption of WI
2024-06-20
Start of work
2025-01-17
AP
  Found 5 Items...
Displaying items 1 to 5 ...
 
New Query

ETSI Home Page Any comments or problems with this application? Please let us know...