2024-11-21 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RE/SMG-071110PR6-1' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
RE/SMG-071110PR6-1 (PDF Format) Download standrd ref:
RE/SMG-071110PR6-1 (Word Format)
  RE/SMG-071110PR6-1 ETS 300 607-1 079 SMG 07
  Current Status
(Click to View Full Schedule)
Edition Cover Date Standstill Creation Date
  Publication (1998-08-24) 8 1998-08-31 View Standstill Information 1998-12-02
  Rapporteur Technical Officer Harmonised Standard
  Jean-Jacques Davidian Ian Doig No View Transposition Data
 
Title Digital cellular telecommunications system (Phase 2) (GSM); Mobile Station (MS) conformance specification; Part 1: Conformance specification (GSM 11.10-1 version 4.21.1)
 
Scope and Field
of Application
SUBJECT
Editorial modifications to section 3.2.2, table 3.1 Applicability of EFR tests
Phase 2+Transmitter: Frequency error and phase error in multislot configuration
Allow use of artificial ear type 3.2 for speech teleservices tests
Phase 2- Section 14 - incorrect references to Phase 1
Phase 2- section 20.8Cell reselection when C1 (serving cell) < 0 for 5 seconds
Phase 2- section 20.20.2Multiband cell selection and reselection / Cell reselection
Phase 2- section 30.6.1 Echo loss
Phase 2-Editorial modifications to section 12.1.1.4.2
Section 30 and section 2 Allow use of artificial ear type 3.2 PIXIT
Editorial modifications to section 22.5
Editorial modification of section 22.2
Phase2 Editorial modifications to section 20.1.4.1 & 20.20.1.4.1
Editorial correction to Section 26.10.2.5.3 CR to 11-10-1,Editorial correction to Section 26.10.2.5.3
CR to 11.10-1 Section 29.3.2.6.7 Total loss of response to checkpointing
CR to 11.10-1 Section 29.3.2.6.5 No response to checkpointing
CR to 11.10-1 Section 29.3.2.6.3 End of a sequence
CR to 11.10-1 Section 29.3.2.6.2 End of a window
CR to 11.10-1 Section 29.3.2.6.1 SS in checkpoint recovery mode
CR to 11.10-1 Section 29.3.2.2.2 Transmission Window
CR to 11.10-1 Section 29.3.1.2.2 Total loss of UA frame
Addition of test case references
Editorial modifications to Annex 3.2.3.1/3/4 removal of Phase 1 references
Editorial modifications to section 26.12.2.2
Section 26.10.2.3 Incorrect Frequencies Specified
Correction of 26.7.4.3.4
Editorial modifications to section 26.12.2.1.3
Editorial modifications to section 31.6.2.4
Phase 2 Addition of a test purpose in 26.11.3 to test L2 pseudolength different from 18 in SysInfo 2ter
 
Supporting
Organizations
Not Available

 

Keywords Projects Clusters Frequencies Mandates Directives
  GSM
GSM_PHASE2
MOBILE
MS
RADIO
GSM
MCC_GSM_reporting
    T-247
 
Official Journal
     
Remarks
    TS into ETS (6/93)
 

ETSI Home Page Any comments or problems with this application? Please let us know...