2024-11-21 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'REN/EE-02101' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
REN/EE-02101 (PDF Format) Download standrd ref:
REN/EE-02101 (Word Format)
  REN/EE-02101 EN 300 132-2   EE 02
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2022-09-16) 2.7.1 2022-09-16 View Standstill Information 2021-05-26
  Rapporteur Technical Officer Harmonised Standard
  Beniamino Gorini Marcello Pagnozzi No View Transposition Data
 
Title Environmental Engineering (EE); Power supply interface at the input of Information and Communication Technology (ICT) equipment; Part 2: -48 V Direct Current (DC)
Power supply interface at the input to ICT equipment (-48VDC) 
Scope and Field
of Application
The following items will be part of the revision:
- Clarify the test bench to measure the inrush current
- Clarify the validation of Zc in the reinjected noise test bench
Furthermore, other items that maybe raised during this revision will be addressed but the NWI scope will be revised to reflect the items under revision 
Supporting
Organizations
TELECOM ITALIA S.p.A., Ericsson AB, Huawei Tech.(UK) Co.. Ltd, Nokia France, BT plc 

 

Keywords Projects Clusters Frequencies Mandates Directives
  INTERFACE
POWER SUPPLY
  Better Living with ICT
     
Official Journal
     
Remarks
2022-05-12 pagnozzi WG approval proposal in contribution EE(22)061034 was Accepted by EE
2022-05-11 gorinib Draft contributed - V 2.6.5 contributed for Decision in EE(22)061034 as WG approval
2022-05-11 gorinib Final draft for approval proposal in contribution EE2(22)061005 was Accepted by EE 02
2022-05-11 gorinib Draft contributed - V 2.6.5 contributed for Decision in EE2(22)061005 as Final draft for approval
2022-05-11 GORINIB A new draft is uploaded - V 2.6.5 with status: Final draft for approval - with comment: Draft produced at EE2_61 meeting
2022-05-11 gorinib Stable draft proposal in contribution EE2(22)000002 was Noted by EE 02 (see RC EE2(22)DEC044)
2022-04-11 gorinib Draft contributed - V 2.6.4 contributed for Decision in EE2(22)000002 as Stable draft
2022-04-11 GORINIB A new draft is uploaded - V 2.6.4 with status: Stable draft
2021-12-09 pagnozzi Early draft proposal in contribution EE2(21)060012 was Noted by EE 02 (see RC EE2(21)DIS043)
2021-10-13 gorinib Draft contributed - V 2.6.3 contributed for Discussion in EE2(21)060012 as Early draft
2021-10-13 GORINIB A new draft is uploaded - V 2.6.3 with status: Early draft
2021-10-12 gorinib Draft contributed - V 2.6.2 contributed for Discussion in EE2(21)060008 as Early draft
2021-10-12 GORINIB A new draft is uploaded - V 2.6.2 with status: Early draft
2021-06-18 HOCKLEYR TB adoption of WI EE, see contribution EE(21)059037
2021-05-28 HOCKLEYR WI proposed to WG EE 02, see contribution EE(21)059037
2021-05-28 GORINIB WI accepted by WG EE 02, see contribution EE2(21)059007
2021-05-26 GORINIB WI proposed to WG EE 02, see contribution EE2(21)059007
 

ETSI Home Page Any comments or problems with this application? Please let us know...