2024-11-21 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'REN/EE-017009' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
REN/EE-017009 (PDF Format) Download standrd ref:
REN/EE-017009 (Word Format)
  REN/EE-017009 EN 300 019-2-5   EE 01
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2021-09-15) 3.1.1 2021-09-15 View Standstill Information 2020-05-25
  Rapporteur Technical Officer Harmonised Standard
  Beniamino Gorini Marcello Pagnozzi No View Transposition Data
 
Title Environmental Engineering (EE); Environmental conditions and environmental tests for telecommunications equipment; Part 2: Specification of environmental tests; Sub-part 5: Ground vehicle installations
 
Scope and Field
of Application
This revision is to:
- update the reference standards
- check whether the test methods are still in line with IEC standards
- add the performance criteria
- improve the notes of each test and the test applicability 
Supporting
Organizations
Orange, Nokia Corporation, TELECOM ITALIA S.p.A., HUAWEI TECHNOLOGIES Co. Ltd. 

 

Keywords Projects Clusters Frequencies Mandates Directives
  ENVIRONMENT
EQUIPMENT PRACTICE
MOBILE
TERRESTRIAL
TESTING
  Better Living with ICT
     
Official Journal
     
Remarks
2021-05-28 pagnozzi WG approval proposal in contribution EE(21)059025 was Accepted by EE
2021-05-25 pagnozzi Draft contributed - V 3.0.5 contributed for Decision in EE(21)059025 as WG approval
2021-05-25 pagnozzi Final draft for approval proposal in contribution EE1(21)059007 was Accepted by EE 01
2021-05-25 gorinib Draft contributed - V 3.0.5 contributed for Decision in EE1(21)059007 as Final draft for approval
2021-05-25 GORINIB A new draft is uploaded - V 3.0.5 with status: Final draft for approval
2021-05-25 gemma Final draft for approval proposal in contribution EE1(21)059002 was Noted by EE 01 (see RC EE1(21)DEC021)
2021-05-11 gorinib Draft contributed - V 3.0.3 contributed for Decision in EE1(21)059002 as Final draft for approval
2021-05-11 GORINIB A new draft is uploaded - V 3.0.3 with status: Final draft for approval - with comment: Final draft for approval with revisions from Edithelp
2020-12-08 pagnozzi Stable draft proposal in contribution EE1(20)058007 was Available by EE 01 (see RC EE1(20)DIS018)
2020-10-08 pagnozzi Draft contributed - V 3.0.2 contributed for Discussion in EE1(20)058007 as Stable draft
2020-10-05 GORINIB A new draft is uploaded - V 3.0.2 with status: Stable draft
2020-10-05 gorinib Draft contributed - V 3.0.1 contributed for Discussion in EE1(20)058003 as Early draft
2020-06-03 GORINIB A new draft is uploaded - V 3.0.1 with status: Early draft
2020-05-27 PAGNOZZI TB adoption of WI EE, see contribution EE(20)057018
2020-05-26 PAGNOZZI WI proposed to WG EE 01, see contribution EE(20)057018
2020-05-26 PAGNOZZI WI accepted by WG EE 01, see contribution EE1(20)057003r1
2020-05-26 PAGNOZZI WI proposed to WG EE 01, see contribution EE1(20)057003r1
2020-05-25 GORINIB WI proposed to WG EE 01, see contribution EE1(20)057003
 

ETSI Home Page Any comments or problems with this application? Please let us know...