2024-11-21 | Work Programme | Version 2.3.3 |
Work Item Reference | ETSI Doc. Number |
STF | Technical Body in Charge |
Download Standard |
|||
RE/SMG-071110PR2-3 | ETS 300 607-3 | 079 | SMG 07 | ||||
Current Status (Click to View Full Schedule) |
Edition | Cover Date | Standstill | Creation Date | |||
|
4 | 1997-08-30 | View Standstill Information | 1997-02-21 | |||
Rapporteur | Technical Officer | Harmonised Standard | |||||
Shicheng Hu | Ian Doig | No | View Transposition Data | ||||
Title |
Digital cellular telecommunications system (Phase 2) (GSM); Mobile Station (MS) conformance specification; Part 3: Layer 3 (L3) Abstract Test Suite (ATS) (GSM 11.10-3 version 4.18.1) |
||||||
Scope and Field of Application |
This European Telecommunications Standard specifies the Abstract Test Suite (ATS) and partial PIXIT proforma for the Network Layer (Layer 3) at the mobile radio interface of the GSM or DCS (phase 2) mobile stations (MS) conforming to the ETSs for the Radio Resource management. 21/02/97: (ID) version 4.18.0 crearet at SMG#21 as a result of CRs:SUB JECT Improvement in test step BasicServiceMT LAI value parameterisation Correction of location updating types CM service REQUEST & ACCEPT Wrong variable storing frame number in MM_LUP_imsi1 Facility iei in non FACILITY messages Reconfigure test system during test in TC_26_6_2_3_1 Timing check Replacement of TSO OC_LengthOfComp1 Improvement in test step IdleUpdated Corrections in TC_26_7_4_3_2 Default RELEASE message in section 26.9 Corrections in TC_26_7_3_2 Corrections in TC_26_2_4_6 Corrections in TC_26_6_6_1 Improvement in test step BasicServiceMO Corrections in TC_26_7_4_3_3 TSOs for change of cell power levels Corrections on the test step for stop of a main DCCH channel Problems related to channel release Corrections of constraints for for SMS testing T_guard time too short in TC_34_2_1, TC_34_2_2 Wrong TI flag in TC_31_8_1_1, TC_31_8_3_1, TC_34_2_3 Corrections in TC_26_5_6_3 Corrections of TC_31_6_2_5 Verdict corrections in TC_34_3 Wrong TCVs in TC_26_9_6_1_2 & TC_34_2_3 Call clearing during CP data exchange in TC_34_2_1 Corrections in TC_26_9_4 & 26_9_5 CM Re-establishment Request in TC_26_7_3_2 OM_FHCHK & OM_FreqDef Wrong ASN.1 INTEGER encoding for e-parameters Call Hold in TC_31_6_1_7 |
||||||
Supporting Organizations |
Not Available |
|
Keywords | Projects | Clusters | Frequencies | Mandates | Directives | |
ATS GSM GSM_PHASE2 LAYER 3 MS PLMN RADIO TERMINAL TESTING |
GSM MCC_GSM_reporting |
T-247 |
|||||
Official Journal |
|
||||||
Remarks |
|
Any comments or problems with this application? Please let us know... | ||