2024-11-24 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'REN/ERM-EMC-379' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
REN/ERM-EMC-379 (PDF Format) Download standrd ref:
REN/ERM-EMC-379 (Word Format)
  REN/ERM-EMC-379 EN 301 489-50   ERM WGEMC
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2019-04-09) 2.2.1 2019-04-09 View Standstill Information 2017-01-31
  Rapporteur Technical Officer Harmonised Standard
  Bruno Liska Antoine Mouquet Yes View Transposition Data
 
Title ElectroMagnetic Compatibility (EMC) standard for radio equipment and services; Part 50: Specific conditions for Cellular Communication Base Station (BS), repeater and ancillary equipment; Harmonised Standard covering the essential requirements of article 3.1(b) of Directive 2014/53/EU
EMC for Cellular Communication BS, repeater and ancillary equipment 
Scope and Field
of Application
Since introduction of new access technologies 5G NR (New Radio), LAA (License Assisted Access) and NB-IoT (Narrow Band - Internet of Things), EMC requirements for AAS (Active Antenna System) and masive MIMO wireless BS equipment with integral antenna array need to be updated. The topics under development include: Emission and imunity prospectives for all EMC phenomena like operating condition, test procedures, performance assessment and performance criteria. Antenna port requirements shall be clarified. Aligning with 3GPP TS 37.114 and TS 38.113.
Review and potential revision of emission and immunity requirements and corresponding test procedures to bring them in line with the latest technology development.
Alignment of clauses of EN 301 489-50 with the clauses of EN 301 489-1 v2.2.1 (main normative references). 
Supporting
Organizations
Ruckus, Ericsson LM, Andrew Wireless Systems GmbH, Nokia Corporation, Huawei Technologies Sweden AB  Ericsson LM, Andrew Wireless Systems GmbH, Nokia Corporation, Huawei Technologies Sweden AB 

 

Keywords Projects Clusters Frequencies Mandates Directives
  EMC
GSM
Harmonised standard
LTE
MSR
OFDMA
WCDMA
WMAN
  Networks
Wireless Systems
  M/536
2014/53/EU
Official Journal
     
Remarks
2017-02-22 BUTSCHEI TB adoption of WI ERM, see contribution ERM(17)061071
2017-02-21 butscheidt Preliminary Draft proposal in contribution ERM(17)061072r2 was Accepted by ERM
2017-02-13 liska Draft contributed - V 0.0.7 contributed for Decision in ERM(17)061072r2 as Preliminary Draft
2017-02-13 liska A new draft is uploaded - V 0.0.7 with status: Preliminary Draft
2017-02-13 liska Preliminary Draft proposal in contribution ERM(17)061072r1 was Revised by ERM
2017-02-07 liska Draft contributed - V 0.0.5 contributed for Decision in ERM(17)061072r1 as Preliminary Draft
2017-02-07 liska Preliminary Draft proposal in contribution ERM(17)061072 was Revised by ERM
2017-02-07 liska A new draft is uploaded - V 0.0.5 with status: Preliminary Draft
2017-02-06 minaev Draft contributed - V 0.0.1 contributed for Decision in ERM(17)061072 as Preliminary Draft
2017-02-06 MINAEV WI proposed to WG ERM WGEMC, see contribution ERM(17)061071
2017-02-06 MINAEV WI accepted by WG ERM WGEMC, see contribution ERMEMC(17)051038r1
2017-02-01 liska Draft contributed - V 0.0.1 contributed for Decision in ERMEMC(17)051056r1 as Preliminary Draft
2017-02-01 liska Preliminary Draft proposal in contribution ERMEMC(17)051056 was Revised by ERM WGEMC
2017-02-01 minaev Draft contributed - V 0.0.1 contributed for Decision in ERMEMC(17)051056 as Preliminary Draft
2017-02-01 minaev A new draft is uploaded - V 0.0.1 with status: Preliminary Draft
2017-02-01 MINAEV WI proposed to WG ERM WGEMC, see contribution ERMEMC(17)051038r1
2017-01-31 LISKA WI proposed to WG ERM WGEMC, see contribution ERMEMC(17)051038
 

Specific aspects
  User/consumer aspects

ETSI Home Page Any comments or problems with this application? Please let us know...