2024-11-21 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'REN/EE-0265' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
REN/EE-0265 (PDF Format) Download standrd ref:
REN/EE-0265 (Word Format)
  REN/EE-0265 EN 300 132-3   EE 02
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2021-07-05) 2.2.1 2021-07-05 View Standstill Information 2016-09-08
  Rapporteur Technical Officer Harmonised Standard
  Lackis Eleftheriadis Marcello Pagnozzi No View Transposition Data
 
Title Environmental Engineering (EE); Power supply interface at the input of Information and Communication Technology (ICT) equipment; Part 3: Up to 400 V Direct Current (DC)
400VDC power interface 
Scope and Field
of Application
The document is copy of existing EN 300 132-3-1, to match the restructuration of EN 300 132 series of standards. It may include refreshing of standard references or editorial improvements. 
Supporting
Organizations
ORANGE, Nokia Corporation, TELECOM ITALIA S.p.A., BT Group Plc, Ericsson AB, HUAWEI TECH. GmbH 

 

Keywords Projects Clusters Frequencies Mandates Directives
  ENVIRONMENT
INTERFACE
POWER SUPPLY
  Better Living with ICT
     
Official Journal
     
Remarks
2021-03-10 pagnozzi TB approval proposal in contribution EE(21)000005 was Accepted by EE (see RC EE(21)DEC141)
2021-02-22 pagnozzi Draft contributed - V 2.1.11 contributed for Decision in EE(21)000005 as Final draft for approval
2021-02-22 pagnozzi A new draft is uploaded - V 2.1.11 with status: Final draft for approval
2020-10-08 gemma WG approval proposal in contribution EE(20)058014 was Accepted by EE
2020-10-06 pagnozzi Draft contributed - V 2.1.8 contributed for Decision in EE(20)058014 as WG approval
2020-10-06 gemma Final draft for approval proposal in contribution EE2(20)000006 was Accepted by EE 02
2020-10-04 hockleyr Draft contributed - V 2.1.8 contributed for Decision in EE2(20)000006 as Final draft for approval
2020-10-04 HOCKLEYR A new draft is uploaded - V 2.1.8 with status: Final draft for approval - with comment: Updated to resolve comments received during EE2 approval by remote consensus
2020-09-04 pagnozzi Stable draft proposal in contribution EE2(20)000003 was Noted by EE 02 (see RC EE2(20)DEC035)
2020-06-22 pagnozzi Draft contributed - V 2.1.7 contributed for Decision in EE2(20)000003 as Stable draft
2020-06-03 eleftheriad A new draft is uploaded - V 2.1.7 with status: Stable draft
2020-05-26 pagnozzi Draft contributed - V 2.1.6 contributed for Discussion in EE2(20)057006 as Stable draft
2020-05-19 eleftheriad Draft contributed - V 2.1.6 contributed for Discussion in EE2(20)057002 as Stable draft
2020-05-19 eleftheriad A new draft is uploaded - V 2.1.6 with status: Stable draft
2019-05-17 gemma Draft contributed - V 2.1.5 contributed for Decision in EE2(19)055008 as Final draft for approval
2019-05-17 gemma Status updated - V 2.1.5 with status: Final draft for approval
2019-05-15 ericssona A new draft is uploaded - V 2.1.5 with status: Stable draft - with comment: Reviewed and prepared by the rapporteur on EE_55 meeting
2018-05-29 marquet Draft contributed - V 2.1.4 contributed for Discussion in EE2(18)053007r1 as Stable draft
2018-05-29 marquet Stable draft proposal in contribution EE2(18)053007 was Revised by EE 02
2018-05-29 marquet A new draft is uploaded - V 2.1.4 with status: Stable draft
2018-05-12 marquet Draft contributed - V 2.1.3 contributed for Discussion in EE2(18)053007 as Stable draft
2018-05-12 marquet A new draft is uploaded - V 2.1.3 with status: Stable draft - with comment: draft revised based on november editor notes and work on EN 300 132-1 and -2
2017-11-22 marquet Draft contributed - V 2.1.2 contributed for Discussion in EE2(17)052015 as Working Draft
2017-11-22 marquet A new draft is uploaded - V 2.1.2 with status: Preliminary Draft - with comment: early draft from EE_EE2 _52 with right title, and ed notes
2017-03-17 marquet Draft contributed - V 0.0.1 contributed for Discussion in EE2(17)000005 as Preliminary Draft
2017-03-17 marquet A new draft is uploaded - V 0.0.1 with status: Preliminary Draft - with comment: Draft V2.1.15 d'EN 300 132-3-2 devenant -1 en V001 suite à emeeting 17 March 2017
2016-09-08 MARQUET WI proposed to TB EE, see contribution EE(16)050031
2016-09-08 MARQUET WI accepted by WG EE 02, see contribution EE2(16)050023
2016-09-08 MARQUET WI proposed to WG EE 02, see contribution EE2(16)050023
 

ETSI Home Page Any comments or problems with this application? Please let us know...