2024-11-21 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DEN/ERM-TGUWB-132' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DEN/ERM-TGUWB-132 (PDF Format) Download standrd ref:
DEN/ERM-TGUWB-132 (Word Format)
  DEN/ERM-TGUWB-132 EN 302 065-4   ERM TGUWB
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Citation in the OJ (2017-04-12) 1.1.1 2016-11-15 View Standstill Information 2015-02-25
  Rapporteur Technical Officer Harmonised Standard
  Friedbert Berens Igor Minaev Yes View Transposition Data
 
Title Short Range Devices (SRD) using Ultra Wide Band technology (UWB); Harmonised Standard covering the essential requirements of article 3.2 of the Directive 2014/53/EU; Part 4: Material Sensing devices using UWB technology below 10,6 GHz
UWB Material Sensing devices 
Scope and Field
of Application
To merge the current standards (EN 302 435 & EN 302 498) and to amended based on changes in the current EC and ECC framework.
The present document specifies the requirements for material sensing applications using UWB technology operating in all or part of the frequency band from 2,2 GHz to 8,5 GHz. Additionally, it specifies reduced emissions in the ranges from 0,96 GHz to 2,2 GHz and 8,5 GHz to 10,6 GHz.
In addition the revision of current standard parts to cover the essential requirements of article 3.2 of the RE-D.  
Supporting
Organizations
ROBERT BOSCH GmbH, THALES, Ubisense Ltd, FBConsulting S.A.R.L., Novelda AS 

 

Keywords Projects Clusters Frequencies Mandates Directives
  Harmonised standard
RADIO
SRD
TESTING
UWB
  Better Living with ICT
Connecting Things
Home & Office
Wireless Systems
  M/536
2014/53/EU
Official Journal
2017-04-12 C118/61 First publication in OJEU under RED
Remarks
2016-07-27 mahler Draft Review after PE proposal in contribution ERMTGUWB(16)033018 was Accepted by ERM TGUWB
2016-07-26 mahler Draft contributed - V 1.1.1 contributed for Decision in ERMTGUWB(16)033018 as Draft Review after PE
2016-07-26 mahler A new draft is uploaded - V 1.1.1 with status: Draft Review after PE - with comment: Outcome resolution meeting
2016-02-23 butscheidt WG approval proposal in contribution ERM(16)058055 was Accepted by ERM
2016-02-03 mahler Draft contributed - V 1.0.1 contributed for Decision in ERM(16)058055 as WG approval
2016-02-03 mahler Final draft for approval proposal in contribution ERMTGUWB(16)000009r2 was Accepted by ERM TGUWB
2016-02-03 mahler Draft contributed - V 1.0.1 contributed for Decision in ERMTGUWB(16)000009r2 as Final draft for approval
2016-02-03 mahler Final draft for approval proposal in contribution ERMTGUWB(16)000009r1 was Revised by ERM TGUWB
2016-02-03 mahler A new draft is uploaded - V 1.0.1 with status: Final draft for approval - with comment: for ENAP
2016-02-02 berens Draft contributed - V 0.0.6 contributed for Decision in ERMTGUWB(16)000009r1 as Final draft for approval
2016-02-02 berens Final draft for approval proposal in contribution ERMTGUWB(16)000009 was Revised by ERM TGUWB
2016-02-02 berens Draft contributed - V 0.0.6 contributed for Decision in ERMTGUWB(16)000009 as Final draft for approval
2016-02-02 berens A new draft is uploaded - V 0.0.6 with status: Final draft for approval
2016-01-21 berens A new draft is uploaded - V 0.0.5 with status: Stable draft - with comment: Added draft general section and Annex D
2016-01-19 berens A new draft is uploaded - V 0.0.4 with status: Stable draft
2016-01-19 berens A new draft is uploaded - V 0.0.3 with status: Stable draft
2015-11-16 berens A new draft is uploaded - V 0.0.2 with status: Early draft - with comment: Early Draft after discussion in drafting group 16.11.2015,
2015-11-10 berens A new draft is uploaded - V 0.0.1 with status: Early draft - with comment: This is an early draft with some questions and comments to be clarified.
2015-03-26 MAHLER TB adoption of WI ERM, see contribution ERM(15)055045r1
2015-03-26 MAHLER WI proposed to TB ERM, see contribution ERM(15)055045r1
2015-03-05 MAHLER WI proposed to TB ERM, see contribution ERM(15)055045
2015-03-05 MAHLER WI accepted by WG ERM TGUWB, see contribution ERMTGUWB(15)028010r1
2015-03-05 MAHLER WI proposed to WG ERM TGUWB, see contribution ERMTGUWB(15)028010r1
2015-02-25 MAHLER WI proposed to WG ERM TGUWB, see contribution ERMTGUWB(15)028010
 

ETSI Home Page Any comments or problems with this application? Please let us know...