2024-11-21 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'REN/ERM-TGSRR-77' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
REN/ERM-TGSRR-77 (PDF Format) Download standrd ref:
REN/ERM-TGSRR-77 (Word Format)
  REN/ERM-TGSRR-77 EN 302 858   ERM TGSRR
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2016-12-12) 2.1.1 2016-12-12 View Standstill Information 2015-02-19
  Rapporteur Technical Officer Harmonised Standard
  Andreas John Igor Minaev Yes View Transposition Data
 
Title Short Range Devices; Transport and Traffic Telematics (TTT); Radar equipment operating in the 24,05 GHz to 24,25 GHz or 24,05 GHz to 24,50 GHz range; Harmonised Standard covering the essential requirements of article 3.2 of the Directive 2014/53/EU
vehicular radar operating in 24 GHz NB range 
Scope and Field
of Application
HEN covering the technical requirements and measurement procedures for short range vehicular radar operating in the 24,05 GHz to 24,25 GHz or 24,05 GHz to 24,50 GHz range; Revision and merging of current standard parts (EN 302 858-1 and 302 858-2) to cover the essential requirements of article 3.2 of the RE-D. 
Supporting
Organizations
JSConsulting, Continental Automotive GmbH, Valeo Radar Systems Inc., Hella 

 

Keywords Projects Clusters Frequencies Mandates Directives
  Harmonised standard
RADAR
RADIO
RTTT
SRD
TESTING
  Transportation
  M/536
2014/53/EU
Official Journal
     
Remarks
2016-07-25 butscheidt Draft contributed - V 1.0.1 contributed for Decision in ERM(16)59b012 as Draft Review after PE
2016-07-25 butscheidt A new draft is uploaded - V 1.0.1 with status: Draft Review after PE - with comment: The results of the resolution meeting: successful. The resolution meeting was during TG SRR_25.
2016-02-25 butscheidt WG approval proposal in contribution ERM(16)058058 was Accepted by ERM
2016-02-05 mahler Draft contributed - V 1.0.0 contributed for Decision in ERM(16)058058 as WG approval
2016-02-05 mahler Final draft for approval proposal in contribution ERMTGSRR(16)000006 was Accepted by ERM TGSRR
2016-02-05 mahler Draft contributed - V 1.0.0 contributed for Decision in ERMTGSRR(16)000006 as Final draft for approval
2016-02-05 mahler A new draft is uploaded - V 1.0.0 with status: Final draft for approval - with comment: for ENAP, after TG SRR GoTo meeting 4th of Feb.
2016-01-22 minaev Draft contributed - V 0.0.6 contributed for Decision in ERMTGSRR(16)023008 as Final draft for approval
2016-01-22 minaev A new draft is uploaded - V 0.0.6 with status: Final draft for approval - with comment: Result of TGSRR_23
2016-01-21 johna A new draft is uploaded - V 0.0.5 with status: Early draft - with comment: End of day 2 of TGSRR_23.
2016-01-15 johna A new draft is uploaded - V 0.0.4 with status: Early draft
2016-01-13 johna A new draft is uploaded - V 0.0.3 with status: Early draft - with comment: Added details on Rx testing and general improvements.
2016-01-10 johna A new draft is uploaded - V 0.0.1 with status: Early draft
2015-03-26 MAHLER TB adoption of WI ERM, see contribution ERM(15)055035r2
2015-03-26 MAHLER WI proposed to TB ERM, see contribution ERM(15)055035r2
2015-03-05 MAHLER WI proposed to TB ERM, see contribution ERM(15)055035r1
2015-03-05 MAHLER WI proposed to TB ERM, see contribution ERM(15)055035
2015-03-05 MAHLER WI accepted by WG ERM TGSRR, see contribution ERMTGSRR(15)020009r3
2015-03-05 MAHLER WI proposed to WG ERM TGSRR, see contribution ERMTGSRR(15)020009r3
2015-02-23 MAHLER WI proposed to WG ERM TGSRR, see contribution ERMTGSRR(15)020009r2
2015-02-23 MAHLER WI proposed to WG ERM TGSRR, see contribution ERMTGSRR(15)020009r1
2015-02-19 MAHLER WI proposed to WG ERM TGSRR, see contribution ERMTGSRR(15)020009
 

ETSI Home Page Any comments or problems with this application? Please let us know...