2024-03-29 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'REN/ERM-EMC-330' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
REN/ERM-EMC-330 (PDF Format) Download standrd ref:
REN/ERM-EMC-330 (Word Format)
  REN/ERM-EMC-330 EN 300 386   ERM WGEMC
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2016-07-11) 2.1.1 2016-07-11 View Standstill Information 2015-02-09
  Rapporteur Technical Officer Harmonised Standard
  Beniamino Gorini Igor Minaev Yes View Transposition Data
 
Title Telecommunication network equipment; ElectroMagnetic Compatibility (EMC) requirements; Harmonised Standard covering the essential requirements of the Directive 2014/30/EU
Revision of EN300386 
Scope and Field
of Application
To revise:
- Scope: it should be removed the exclusion of Optical amplifiers as these items are in transmission products
- References: update with the latest basic standards and adding EN 55032.
- Definitions: it needs to change the definition of “public network”
- Tests methods: add details on how to test multiple power ports connected to the same source; possible alignment with test method for surge immunity in latest EN 61000-4-5
- Emission requirements: add the EN 55032
- Emission on DC power port: remove the statement about 6 dB margin on noise floor because already covered by basic standards
- Radiate emissions: reference to EN 300 127 “test on large TLC systems” to be replaced by EN 55016-2-3
- Radiated immunity: frequency range to be extended up to 6 GHz to cover the immunity requirements of radio services in the frequency range 2,7-6 GHz
- EFT pulse repetition rate on signal ports: 100 kHz frequency to be adopted for xDLS ports
- Performance criteria for power supply equipment: the power systems with output up to 400 V- DC (ref.: EN 330132-3-1) have to be included
 
Supporting
Organizations
Ministry of Economic Affairs, Ofcom (U.K.), Alcatel-Lucent, Ericsson LM, TELECOM ITALIA S.p.A., Cisco Systems Belgium 

 

Keywords Projects Clusters Frequencies Mandates Directives
  EMC
Harmonised standard
NETWORK
TESTING
  Networks
Wireless Systems
  M/552
2014/30/EU
Official Journal
     
Remarks
2016-02-23 butscheidt Draft Review after PE proposal in contribution ERM(16)058036 was Accepted by ERM
2016-02-01 gorini Draft contributed - V 0.0.8 contributed for Decision in ERM(16)058036 as Draft Review after PE
2016-02-01 gorini Draft contributed - V 0.0.8 contributed for Decision in ERMEMC(16)047026 as Draft Review after PE
2016-02-01 gorini A new draft is uploaded - V 0.0.8 with status: Draft Review after PE - with comment: Draft review after PE and RC in ERM-EMC WG
2016-01-13 gorini Draft contributed - V 0.0.7 contributed for Decision in ERMEMC(16)047021 as Draft Review after PE
2016-01-13 gorini A new draft is uploaded - V 0.0.7 with status: Draft Review after PE - with comment: Draft with resolution of comments received from ENAP
2015-08-18 butscheidt TB approval proposal in contribution ERM(15)000015r1 was Accepted by ERM (see RC ERM(15)DEC257)
2015-07-07 minaev Draft contributed - V 0.0.6 contributed for Decision in ERM(15)000015r1 as Final draft for approval
2015-07-07 minaev A new draft is uploaded - V 0.0.6 with status: Final draft for approval
2015-07-07 minaev WG approval proposal in contribution ERM(15)000015 was Noted by ERM (see RC ERM(15)DEC251)
2015-07-01 minaev Draft contributed - V 0.0.4 contributed for Decision in ERM(15)000015 as Final draft for approval
2015-07-01 minaev A new draft is uploaded - V 0.0.5 with status: Final draft for approval - with comment: TC ERM_56 agreed to sent the document for AbC.
2015-06-09 butscheidt Final draft for approval proposal in contribution ERM(15)056088 was Withdrawn by ERM
2015-06-09 muellerandr Draft contributed - V 0.0.4 contributed for Decision in ERM(15)056089 as Final draft for approval
2015-06-09 muellerandr Draft contributed - V 0.0.4 contributed for Decision in ERM(15)056088 as Final draft for approval
2015-06-08 gorini Draft contributed - V 0.0.4 contributed for Decision in ERMEMC(15)045027 as Final draft for approval
2015-06-08 gorini A new draft is uploaded - V 0.0.4 with status: Final draft for approval - with comment: Final draft agreed at ERM-EMCWG_45
2015-05-22 gorini Draft contributed - V 0.0.3 contributed for Discussion in ERMEMC(15)045021 as Stable draft
2015-05-22 gorini A new draft is uploaded - V 0.0.3 with status: Stable draft
2015-05-17 gorini TB adoption of WI proposal in contribution ERMEMC(15)000007 was Noted by ERM WGEMC (see RC ERMEMC(15)DIS006)
2015-03-26 BUTSCHEI TB adoption of WI ERM, see contribution ERM(15)055060r1
2015-03-26 BUTSCHEI WI proposed to TB ERM, see contribution ERM(15)055060r1
2015-03-10 gorini Draft contributed - V 0.0.2 contributed for Discussion in ERMEMC(15)000007 as Preliminary Draft
2015-03-10 gorini A new draft is uploaded - V 0.0.2 with status: Preliminary Draft - with comment: Preliminary draft produced with comments of ERM-EMC-WG_44
2015-03-06 GORINI WI proposed to TB ERM, see contribution ERM(15)055060
2015-03-06 GORINI WI accepted by WG ERM WGEMC, see contribution ERMEMC(15)044014r1
2015-03-05 GORINI WI proposed to WG ERM WGEMC, see contribution ERMEMC(15)044014r1
2015-02-09 GORINI WI proposed to WG ERM WGEMC, see contribution ERMEMC(15)044014
 

ETSI Home Page Any comments or problems with this application? Please let us know...