2024-11-21 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'REN/ERM-TG26-132' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
REN/ERM-TG26-132 (PDF Format) Download standrd ref:
REN/ERM-TG26-132 (Word Format)
  REN/ERM-TG26-132 EN 301 688   ERM TGMARINE
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2016-03-04) 1.2.1 2016-03-04 View Standstill Information 2014-09-30
  Rapporteur Technical Officer Harmonised Standard
  Pete A. Hizzey Andrea Lorelli No View Transposition Data
 
Title Technical characteristics and methods of measurement for fixed and portable VHF equipment operating on 121,5 MHz and 123,1 MHz
ixed and portable VHF equipment operating on 121,5 MHz and 123,1 MHz 
Scope and Field
of Application
Revision in order to take into account the new IMO requirements
 
Supporting
Organizations
ICOM (C.E.P.) FRANCE, Yaesu Musen Co. Ltd., Marine Rescue Technologies ltd, Raymarine Belgium Bvba 

 

Keywords Projects Clusters Frequencies Mandates Directives
  MARITIME
RADIO
SAR
VHF
  Public Safety
Security
Transportation
Wireless Systems
     
Official Journal
     
Remarks
2015-10-07 minaev Draft contributed - V 0.0.5 contributed for Decision in ERM(15)000080 as Draft Review after PE
2015-10-07 minaev Draft Review after PE proposal in contribution ERMTG26(15)043008a1 was Accepted by ERM TG26
2015-10-07 minaev Draft contributed - V 0.0.5 contributed for Decision in ERMTG26(15)043008a1 as Draft Review after PE
2015-10-07 minaev A new draft is uploaded - V 0.0.5 with status: Draft Review after PE
2015-03-26 butscheidt Final draft for approval proposal in contribution ERM(15)055057r1 was Accepted by ERM
2015-03-26 minaev Draft contributed - V 0.0.4 contributed for Decision in ERM(15)055057r1 as Final draft for approval
2015-03-26 minaev WG approval proposal in contribution ERM(15)055057 was Revised by ERM
2015-03-26 minaev A new draft is uploaded - V 0.0.4 with status: Final draft for approval
2015-03-05 lorelli Draft contributed - V 0.0.3 contributed for Decision in ERM(15)055057 as WG approval
2015-03-05 lorelli Final draft for approval proposal in contribution ERMTG26(15)040023 was Accepted by ERM TG26
2015-03-05 lorelli Draft contributed - V 0.0.3 contributed for Decision in ERMTG26(15)040023 as Final draft for approval
2015-03-05 lorelli A new draft is uploaded - V 0.0.3 with status: Final draft for approval
2015-03-03 lorelli Draft contributed - V 0.0.2 contributed for Decision in ERMTG26(15)040016 as Final draft for approval
2015-03-03 lorelli A new draft is uploaded - V 0.0.2 with status: Final draft for approval
2015-03-03 lorelli Draft contributed - V 0.0.1 contributed for Decision in ERMTG26(15)040014 as Final draft for approval
2015-03-03 lorelli A new draft is uploaded - V 0.0.1 with status: Final draft for approval
2014-11-14 LORELLI TB adoption of WI ERM, see contribution ERM(14)53b044 in RC ERM(14)DEC178
2014-10-02 LORELLI WI proposed to TB ERM, see contribution ERM(14)53b044
2014-10-02 LORELLI WI accepted by WG ERM TG26, see contribution ERMTG26(14)039010r1
2014-10-02 LORELLI WI proposed to WG ERM TG26, see contribution ERMTG26(14)039010r1
2014-09-30 LORELLI WI proposed to WG ERM TG26, see contribution ERMTG26(14)039010
 

ETSI Home Page Any comments or problems with this application? Please let us know...