2024-11-21 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DEN/ERM-TGUWB-125' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DEN/ERM-TGUWB-125 (PDF Format) Download standrd ref:
DEN/ERM-TGUWB-125 (Word Format)
  DEN/ERM-TGUWB-125 EN 303 883   ERM TGUWB
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2016-09-29) 1.1.1 2016-09-29 View Standstill Information 2014-09-09
  Rapporteur Technical Officer Harmonised Standard
  Michael Mahler Igor Minaev No View Transposition Data
 
Title Short Range Devices (SRD) using Ultra Wide Band (UWB); Measurement Techniques
new EN based on TS 102 883 
Scope and Field
of Application
based on actual published version TS 102 883 and with comments during the consultation of the linked EN 302 065 -1 to -3 and with a future measurement procedure for LDC (outcome STF411) to develop new EN
 
Supporting
Organizations
ROBERT BOSCH GmbH, Pirelli Tyre SpA, FBConsulting S.A.R.L., Insta Elektro GmbH, Novelda AS 

 

Keywords Projects Clusters Frequencies Mandates Directives
  SRD
TESTING
UWB
  Better Living with ICT
Connecting Things
Home & Office
Wireless Systems
     
Official Journal
     
Remarks
2016-06-09 minaev Draft Review after PE proposal in contribution ERM(16)059045r1 was Accepted by ERM
2016-06-07 mahler Draft contributed - V 1.1.2 contributed for Decision in ERM(16)059045r1 as Draft Review after PE
2016-06-07 mahler Draft Review after PE proposal in contribution ERM(16)059045 was Revised by ERM
2016-06-07 mahler A new draft is uploaded - V 1.1.2 with status: Draft Review after PE - with comment: one editorial error found within the numbering of the clause (6.3.3.5 we have had two times)
2016-05-11 mahler Draft contributed - V 1.1.1 contributed for Decision in ERM(16)059045 as Draft Review after PE
2016-05-11 mahler Draft Review after PE proposal in contribution ERMTGUWB(16)032007 was Accepted by ERM TGUWB
2016-05-11 mahler Draft contributed - V 1.1.1 contributed for Decision in ERMTGUWB(16)032007 as Draft Review after PE
2016-05-11 mahler A new draft is uploaded - V 1.1.1 with status: Draft Review after PE - with comment: After successful resolution
2015-12-01 butscheidt Final draft for approval proposal in contribution ERM(15)057042r1 was Accepted by ERM
2015-11-13 mahler Draft contributed - V 1.0.2 contributed for Decision in ERM(15)057042r1 as Final draft for approval
2015-11-13 mahler Final draft for approval proposal in contribution ERM(15)057042 was Revised by ERM
2015-11-13 mahler Draft contributed - V 1.0.2 contributed for Decision in ERM(15)057042 as Final draft for approval
2015-11-13 mahler Draft contributed - V 1.0.2 contributed for Decision in ERMTGUWB(15)030ad019 as Final draft for approval
2015-11-13 mahler A new draft is uploaded - V 1.0.2 with status: Final draft for approval - with comment: with final editorial corrections
2015-11-12 mahler A new draft is uploaded - V 1.0.1 with status: Final draft for approval - with comment: amended version TG UWB_30 Adhoc. Final editorial changes necessary. Document will be sent to ERM_57 for approval for ENAP
2015-11-11 mahler Final draft for approval proposal in contribution ERMTGUWB(15)030ad004 was Revised by ERM TGUWB
2015-10-23 mahler Draft contributed - V 1.0.0 contributed for Decision in ERMTGUWB(15)030ad004 as Final draft for approval
2015-10-23 mahler A new draft is uploaded - V 1.0.0 with status: Final draft for approval
2015-10-15 mahler A new draft is uploaded - V 0.0.7 with status: Stable draft - with comment: Outcome TG UWB_30
2015-10-14 mahler Draft contributed - V 0.0.6 contributed for Decision in ERMTGUWB(15)030009 as Early draft
2015-10-14 mahler A new draft is uploaded - V 0.0.6 with status: Early draft
2015-10-14 mahler Draft contributed - V 0.0.5 contributed for Discussion in ERMTGUWB(15)030007 as Early draft
2015-10-14 mahler A new draft is uploaded - V 0.0.5 with status: Early draft - with comment: working draft during TG UWB_30
2015-07-13 mahler Draft contributed - V 0.0.4 contributed for Discussion in ERMTGUWB(15)000026 as Early draft
2015-07-13 mahler A new draft is uploaded - V 0.0.4 with status: Early draft
2015-06-23 mahler A new draft is uploaded - V 0.0.3 with status: Early draft
2015-06-22 mahler Draft contributed - V 0.0.2 contributed for Discussion in ERMTGUWB(15)000024 as Early draft
2015-06-22 mahler A new draft is uploaded - V 0.0.2 with status: Early draft - with comment: update based on work HS skeleton
2015-03-30 mahler A new draft is uploaded - V 0.0.1 with status: Early draft
2014-10-14 MAHLER TB adoption of WI ERM, see contribution ERM(14)53b027 in RC ERM(14)DEC167
2014-09-09 MAHLER WI proposed to TB ERM, see contribution ERM(14)53b027
2014-09-09 MAHLER WI accepted by WG ERM TGUWB, see contribution ERMTGUWB(14)026019
2014-09-09 MAHLER WI proposed to WG ERM TGUWB, see contribution ERMTGUWB(14)026019
 

ETSI Home Page Any comments or problems with this application? Please let us know...