Work Item Reference |
ETSI Doc. Number |
STF |
Technical Body in Charge |
Download Standard
|
|
REN/EE-0252
|
EN 300 132-2
|
|
EE 02
|
|
Current Status (Click to View Full Schedule) |
Latest Version
|
Cover Date |
Standstill |
Creation Date |
|
Publication (2016-10-07)
|
2.5.1
|
2016-10-07
|
View Standstill Information
|
2014-05-21
|
|
Rapporteur |
Technical Officer |
Harmonised Standard |
|
|
Beniamino Gorini
|
Marcello Pagnozzi
|
No
|
View Transposition Data
|
|
Title
|
Environmental Engineering (EE); Power supply interface at the input to telecommunications and datacom (ICT) equipment; Part 2: Operated by -48 V direct current (dc) Power supply interface at the input to telecommunications equipment (DC powered)
|
Scope and Field of Application
|
The following items should be revised in the present EN 300 132-2 V2.4.6: 1)Clause 4.3.2 “Abnormal conditions: voltage variations, dips and short interruptions” in order to cover the fault conditions on the DC network (e.g. 10 ms dips) 2)Clause 4.9 “Conducted emissions requirements of the telecommunications and datacom (ICT) equipment at interface "A"”. Clarify the applicability of this test when there are no analog ports. 3) To correct the capacitor value of figure 5 4) to revise inrush current requirement in clause 4.7 and Annex C in line with EN 300 132-3-1
|
Supporting Organizations
|
ORANGE, Alcatel-Lucent, TELECOM ITALIA S.p.A., BT Group Plc, Deutsche Telekom AG, ERICSSON
|