2024-11-21 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'REN/ERM-TG11-010' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
REN/ERM-TG11-010 (PDF Format) Download standrd ref:
REN/ERM-TG11-010 (Word Format)
  REN/ERM-TG11-010 EN 300 328   ERM TG11
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  No more cited in the OJ (2017-06-13) 1.9.1 2015-02-13 View Standstill Information 2011-12-07
  Rapporteur Technical Officer Harmonised Standard
  Edgard Vangeel Martin Arndt Yes View Transposition Data
Download Resolution meeting report
 
Title Electromagnetic compatibility and Radio spectrum Matters (ERM); Wideband transmission systems; Data transmission equipment operating in the 2,4 GHz ISM band and using wide band modulation techniques; Harmonized EN covering the essential requirements of article 3.2 of the R&TTE Directive
Wideband transmission systems in 2,4 GHz 
Scope and Field
of Application
(1) To improve existing test methods based on feedback received from test labs and manufactures;
(2) To address issues identified during the resolution meeting of version 1.8.0 and which were noted in the comments resolution report. 
Supporting
Organizations
Motorola Solutions UK Ltd., Cisco Systems Belgium, BROADCOM CORPORATION, Intel Corporation (UK) Ltd, Research in Motion UK Limited, QUALCOMM UK Ltd, ZES BVBA 

 

Keywords Projects Clusters Frequencies Mandates Directives
  DATA
ISM
LAN
MOBILE
RADIO
REGULATION
SPREAD SPECTRUM
SRD
TESTING
TRANSMISSION
UHF
  Wireless Systems
Wideband Data Transmission Systems (2,4 GHz to 2,4835 GHz)
M/284
99/5/EC
Official Journal
2015-04-17 C125/10 1st citation - supersedes V1.8.1 as of 30/11/2016.
Remarks
2014-12-03 butscheidt Draft Review after PE proposal in contribution ERM(14)054021r1 was Accepted by ERM
2014-11-21 vangeel Draft contributed - V 1.8.9 contributed for Decision in ERM(14)054021r1 as Draft Review after PE
2014-11-21 vangeel Draft Review after PE proposal in contribution ERM(14)054021 was Revised by ERM
2014-11-21 vangeel A new draft is uploaded - V 1.8.9 with status: Draft Review after PE - with comment: Final draft after corrections_clarifications agreed during TG11 _41
2014-09-15 arndtma Draft contributed - V 1.8.8 contributed for Decision in ERM(14)054021 as Draft Review after PE
2014-09-12 arndtma Draft Review after PE proposal in contribution ERMTG11(14)000036r1 was Accepted by ERM TG11
2014-09-11 vangeel Draft contributed - V 1.8.8 contributed for Decision in ERMTG11(14)000036r1 as Draft Review after PE
2014-09-11 vangeel Draft Review after PE proposal in contribution ERMTG11(14)000036 was Revised by ERM TG11
2014-09-11 vangeel A new draft is uploaded - V 1.8.8 with status: Draft Review after PE
2014-09-11 vangeel A new draft is uploaded - V 1.8.7 with status: Draft Review after PE
2014-09-10 vangeel A new draft is uploaded - V 1.8.6 with status: Draft Review after PE
2014-09-09 vangeel A new draft is uploaded - V 1.8.5 with status: Draft Review after PE
2014-09-09 vangeel A new draft is uploaded - V 1.8.4 with status: Draft Review after PE - with comment: This version has been prepared by the rapporteur and contains changes to address the comemnts received during ENAP. EVERY SINGLE CHANGE STILL HAS TO BE DISCUSSED AND...
2014-08-01 arndtma Draft contributed - V 1.8.3 contributed for Decision in ERMTG11(14)000036 as Draft Review after PE
2014-08-01 arndtma A new draft is uploaded - V 1.8.3 with status: Draft Review after PE - with comment: Version used for ENAP.
2014-03-28 arndtma Scope of work item revised at ERM#52, see ERM(14)52_045a2.
2014-03-27 butscheidt Final draft for approval proposal in contribution ERM(14)52_045a1r1 was Accepted by ERM
2014-02-28 arndtma Draft contributed - V 1.8.2 contributed for Decision in ERM(14)52_045a1r1 as Final draft for approval
2014-02-28 arndtma WG approval proposal in contribution ERM(14)52_045a1 was Revised by ERM
2014-02-28 arndtma A new draft is uploaded - V 1.8.2 with status: Final draft for approval - with comment: Version pre-processed by editHelp.
2014-02-17 vangeel Draft contributed - V 0.0.17 contributed for Decision in ERM(14)52_045a1 as WG approval
2014-02-17 vangeel Final draft for approval proposal in contribution ERMTG11(14)000015r2 was Accepted by ERM TG11
2014-02-14 vangeel Draft contributed - V 0.0.17 contributed for Decision in ERMTG11(14)000015r2 as Final draft for approval
2014-02-14 vangeel Final draft for approval proposal in contribution ERMTG11(14)000015r1 was Revised by ERM TG11
2014-02-14 vangeel A new draft is uploaded - V 0.0.17 with status: Final draft for approval
2014-02-13 vangeel Draft contributed - V 0.0.16 contributed for Decision in ERMTG11(14)000015r1 as Final draft for approval
2014-02-13 vangeel Stable draft proposal in contribution ERMTG11(14)000015 was Revised by ERM TG11
2014-02-13 vangeel A new draft is uploaded - V 0.0.16 with status: Final draft for approval
2014-02-12 vangeel A new draft is uploaded - V 0.0.15 with status: Stable draft - with comment: Outcome of 12 Feb 2014 - 17h30
2014-02-09 vangeel A new draft is uploaded - V 0.0.14 with status: Stable draft - with comment: Rapporteurs input to TG11_38
2014-01-09 vangeel Draft contributed - V 0.0.13 contributed for Decision in ERMTG11(14)000015 as Stable draft
2014-01-09 vangeel A new draft is uploaded - V 0.0.13 with status: Stable draft
2014-01-08 vangeel A new draft is uploaded - V 0.0.12 with status: Stable draft - with comment: Output of sessions on 8 jan 2014
2014-01-07 vangeel A new draft is uploaded - V 0.0.11 with status: Stable draft
2014-01-05 vangeel A new draft is uploaded - V 0.0.10 with status: Stable draft - with comment: Input from rapporteur to meeting _ 37. All changes still to be discussed and agreed.
2013-10-10 vangeel A new draft is uploaded - V 0.0.9 with status: Early draft
2013-10-09 vangeel A new draft is uploaded - V 0.0.8 with status: Early draft - with comment: Output of 9 october sessions
2013-06-14 vangeel A new draft is uploaded - V 0.0.7 with status: Early draft - with comment: Outcome of meeting 35
2013-06-12 vangeel A new draft is uploaded - V 0.0.6 with status: Early draft - with comment: Input to TG35. Changes still to be discussed.
2013-02-21 vangeel A new draft is uploaded - V 0.0.5 with status: Early draft - with comment: Output of TG11 meeting _34
2013-02-19 vangeel A new draft is uploaded - V 0.0.4 with status: Early draft - with comment: New draft with changes because of documents ERMTG11(13)000009 and 000010
2012-09-13 vangeel A new draft is uploaded - V 0.0.3 with status: Early draft - with comment: Output of meeting TG11_33
2012-09-11 vangeel A new draft is uploaded - V 0.0.2 with status: Early draft - with comment: Input to meeting _ 33 containing changes as agreed during meeting 32
2012-06-06 martin arndt Early draft proposal in contribution ERMTG11(12)000009 was Noted by ERM TG11
2012-06-01 vangeel V 0.0.1 contributed in ERMTG11(12)000009 as Early draft
2012-06-01 vangeel A new draft is uploaded - V 0.0.1 with status: Early draft - with comment: This version is identical to v1.8.1
 

ETSI Home Page Any comments or problems with this application? Please let us know...