2024-03-28 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DEN/ERM-JTFEA-015' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DEN/ERM-JTFEA-015 (PDF Format) Download standrd ref:
DEN/ERM-JTFEA-015 (Word Format)
  DEN/ERM-JTFEA-015 EN 303 084   ERM JTFEA
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  No more cited in the OJ (2017-06-13) 1.1.1 2013-05-30 View Standstill Information 2011-11-16
  Rapporteur Technical Officer Harmonised Standard
  Stefan Mueller Andrea Lorelli Yes View Transposition Data
Download Resolution meeting report
 
Title Ground Based Augmentation System (GBAS) VHF ground-air Data Broadcast (VDB); Technical characteristics and methods of measurement for ground-based equipment; Harmonized EN covering the essential requirements of article 3.2 of the R&TTE Directive
GBAS VDB HS 
Scope and Field
of Application
Development of a Harmonized Standard under article 3.2 of the R&TTE Directive for GBAS VDB ground-based equipment. 
Supporting
Organizations
BMWi, Norwegian P & T Authority, ROHDE & SCHWARZ, EUROCONTROL, BNetzA, UK CAA, Telerad, DFS Deutsche Flugsicherung 

 

Keywords Projects Clusters Frequencies Mandates Directives
  AERONAUTICAL
AM
DSB
RADIO
TESTING
VHF
  Security
Transportation
Wireless Systems
  M/405
99/5/EC
Official Journal
2013-10-12 C 297/29 1st listing on 12/10/2013.
Remarks
2012-11-20 minaev WG approval proposal in contribution ERM(12)48_045 was Accepted by ERM
2012-10-18 ehrhardt Final draft for approval proposal in contribution ERMJTFEA(12)13_009 was Noted by ERM JTFEA
2012-10-18 ehrhardt Draft contributed - V 0.1.7 contributed for Decision in ERM(12)48_045 as WG approval
2012-10-18 ehrhardt Final draft for approval proposal in contribution ERMJTFEA(12)000003 was Accepted by ERM JTFEA
2012-10-17 mller Draft contributed - V 0.1.7 contributed for Decision in ERMJTFEA(12)000003 as Final draft for approval
2012-10-17 mller A new draft is uploaded - V 0.1.7 with status: Final draft for approval
2012-10-17 mller Draft contributed - V 0.1.6 contributed for Decision in ERMJTFEA(12)000002 as Final draft for approval
2012-10-17 mller A new draft is uploaded - V 0.1.6 with status: Final draft for approval
2012-10-16 minaev Draft contributed - V 0.1.3 contributed for Decision in ERMJTFEA(12)13_009 as Final draft for approval
2012-10-16 mller Draft contributed - V 0.1.5 contributed for Decision in ERMJTFEA(12)000001 as Final draft for approval
2012-10-16 mller A new draft is uploaded - V 0.1.5 with status: Final draft for approval
2012-10-15 mller Status updated - V 0.1.3 with status: Final draft for approval
2012-03-16 mller A new draft is uploaded - V 0.1.3 with status: Stable draft
2012-03-07 mller A new draft is uploaded - V 0.1.2 with status: Stable draft
2012-01-17 lorelli A new draft is uploaded - V 0.0.1 with status: Early draft
 

ETSI Home Page Any comments or problems with this application? Please let us know...