2024-11-24 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'REN/EE-02043' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
REN/EE-02043 (PDF Format) Download standrd ref:
REN/EE-02043 (Word Format)
  REN/EE-02043 EN 302 099   EE 02
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2014-08-19) 2.1.1 2014-08-19 View Standstill Information 2011-05-19
  Rapporteur Technical Officer Harmonised Standard
  Wilfried Schulz Marcello Pagnozzi No View Transposition Data
 
Title Environmental Engineering (EE); Powering of equipment in access network
Powering of equipment in access network 
Scope and Field
of Application
To address local & remote powering, power management (alarms), safety,
earthing & bonding, resistibility & EMC, environmental conditions.
Liaison required with CLC TC215.

 
Supporting
Organizations
France Telecom, BT Group Plc, Deutsche Telekom AG, Ericsson AB 

 

Keywords Projects Clusters Frequencies Mandates Directives
  ACCESS
NETWORK
POWER SUPPLY
REMOTE
  Better Living with ICT
  M/462
 
Official Journal
     
Remarks
2014-05-31 marquet A new draft is uploaded - V 2.0.5 with status: Draft Review after PE - with comment: App draft with edit by EE + EE2 chairman from EE2(14)044012r3
2013-09-19 pagnozzi Given the large amount and the nature of changes needed during the editing phase, it is required a new TB approval.
2013-06-05 pagnozzi Working Draft proposal in contribution EE(13)42_019 was Accepted by EE
2013-05-29   Draft contributed - V 0.0.5 contributed for Decision in EE(13)42_019 as Final draft for approval
2013-05-29 marquet A new draft is uploaded - V 0.0.5 with status: Final draft for approval - with comment: For EE approval: revision in EE2 done after remote consensus
2013-05-27 pagnozzi WG approval proposal in contribution EE(13)42_008 was Withdrawn by EE
2013-05-13   Draft contributed - V 0.0.4 contributed for Decision in EE(13)42_009 as WG approval
2013-04-29 marquet Draft contributed - V 0.0.4 contributed for Decision in EE(13)42_008 as WG approval
2013-04-29 marquet WG approval proposal in contribution EE2(13)000001 was Accepted by EE 02 (see RC EE2(13)DEC003)
2013-04-13 marquet Draft contributed - V 0.0.4 contributed for Decision in EE2(13)000001 as Final draft for approval
2013-03-31 marquet A new draft is uploaded - V 0.0.4 with status: Final draft for approval - with comment: The version 3 was a temporary working file of the rapporteur
2012-05-25 marquet V 0.0.1 contributed in EE2(12)40_013 as Early draft
2012-05-25 marquet A new draft is uploaded - V 0.0.1 with status: Early draft - with comment: first draft from napoli EE40 May 2012
 

Specific aspects
  Environmental aspects
  User/consumer aspects
  Security/Privacy aspects

ETSI Home Page Any comments or problems with this application? Please let us know...