2026-06-09 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RTS/RT-0095' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  RTS/RT-0095 TS 103 764   RT
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Early draft (2026-04-29) 0.0.3 Draft 2026-01-08   2025-10-23
  Rapporteur Technical Officer Harmonised Standard
  Pierre Tane Andrea Lorelli No
 
Title Rail Telecommunications (RT); Future Railway Mobile Communication System (FRMCS); System Architecture
FRMCS system architecture 
Scope and Field
of Application
To revise the system architecture for FRMCS 
Supporting
Organizations
Ericsson LM, Union Inter. Chemins de Fer, SNCF RESEAU, Huawei Tech.(UK) Co.. Ltd, Swiss Federal Railways Ltd, Alstom Transport SA, Trafikverket, Nokia Germany, TRAFICOM, Kontron Transportation France 

 

Keywords Projects Clusters Frequencies Mandates Directives
  5G
ARCHITECTURE
FRMCS
mission critical applications
railways
  Transportation
Wireless Systems
  M/603
2016/797/EU
Official Journal
     
Remarks
2026-04-29 taneppi A new draft is uploaded - V 0.0.3 with status: Early draft
2026-02-11 taneppi A new draft is uploaded - V 0.0.2 with status: Early draft
2026-01-23 taneppi A new draft is uploaded - V 0.0.1 with status: Early draft - with comment: v0.0.1 based on ETSI TS 103 764 V1.1.1
2026-01-22   NSBG Adoption vote WA20260122 APPROVED, WI is adopted
2026-01-07 LORELLI WI submitted to NSBG for adoption, vote duration forced to 14 days, see contribution NSBG(26)000001 in vote WA20260122
2026-01-07 Andrea Lorelli Work Item proposal endorsed by TG RT, see contribution RT(25)099029r2
2026-01-07 taneppi WI proposed to TB RT, see contribution RT(25)099029r2
2025-10-24 taneppi WI proposed to TB RT, see contribution RT(25)099029r1
2025-10-23 taneppi WI proposed to TB RT, see contribution RT(25)099029
 

ETSI Home Page Any comments or problems with this application? Please let us know...