2024-04-25 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RGS/NFV-TST010ed431' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
RGS/NFV-TST010ed431 (PDF Format) Download standrd ref:
RGS/NFV-TST010ed431 (Word Format) Download standrd ref:
RGS/NFV-TST010ed431 (Zip Format)
  RGS/NFV-TST010ed431 GS NFV-TST 010   NFV TST
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2023-11-09) 4.3.1 2023-11-09 View Standstill Information 2023-03-20
  Rapporteur Technical Officer Harmonised Standard
  Pierre Lynch Nicolae Madalin Neag No
 
Title Network Functions Virtualisation (NFV) Release 4; Testing API Conformance Testing Specification
 
Scope and Field
of Application
Test descriptions, procedures, methods and test configurations, along with precise expected outcomes that will comprise a conformance test plan for the APIs exposed on the following reference points: Os-Ma-Nfvo, Or-Vnfm, and Ve-Vnfm, defined in NFV Release-4 versions 4.3.1 of ETSI GS NFV-SOL 012, ETSI GS NFV-SOL 011, ETSI GS NFV-SOL 009, ETSI GS NFV-SOL 005, ETSI GS NFV-SOL 003, and ETSI GS NFV-SOL 002, respectively. Where possible, the tests will be specified using means to facilitate automation of the testing. 
Supporting
Organizations
Orange, Ericsson LM, TELEFONICA S.A., Keysight Technologies UK Ltd, DOCOMO Communications Lab. 

 

Keywords Projects Clusters Frequencies Mandates Directives
  API
CONFORMANCE
NFV
TESTING
  Networks
     
Official Journal
     
Remarks
2023-10-20 neagn TB approval proposal in contribution NFV(23)000232 was Accepted by NFV (see RC NFV(23)DEC290)
2023-09-19 lynchpi Draft contributed - V 0.0.3 contributed for Decision in NFV(23)000232 as Final draft for approval
2023-09-19 lynchpi A new draft is uploaded - V 0.0.3 with status: Final draft for approval
2023-06-28 lynchpi Draft contributed - V 0.0.2 contributed for Decision in NFV(23)000149 as Final draft for approval
2023-06-28 lynchpi A new draft is uploaded - V 0.0.2 with status: Final draft for approval
2023-06-28 lynchpi A new draft is uploaded - V 0.0.1 with status: Early draft
2023-04-06 Nicolae Madalin Neag TB adoption of WI NFV, see contribution NFV(23)000075 in RC NFV(23)DEC266
2023-03-20 LYNCHPI WI proposed to TB NFV, see contribution NFV(23)000075
 
Displaying Item 3 of 48...

ETSI Home Page Any comments or problems with this application? Please let us know...