2024-03-29 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RGS/NFV-IFA011ed451' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
RGS/NFV-IFA011ed451 (PDF Format) Download standrd ref:
RGS/NFV-IFA011ed451 (Word Format)
  RGS/NFV-IFA011ed451 GS NFV-IFA 011   NFV IFA
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2023-09-20) 4.5.1 2023-09-20 View Standstill Information 2023-03-16
  Rapporteur Technical Officer Harmonised Standard
  Desaraju Kalyan Nicolae Madalin Neag No
 
Title Network Functions Virtualisation (NFV) Release 4; Management and Orchestration; VNF Descriptor and Packaging Specification
VNF Packaging Spec 
Scope and Field
of Application
This revision of NFV-IFA 011 continues the development of the specification as part of the NFV Release 4. This edition will add requirements to support the Release 4 features. The scope of the former edition is summarized hereafter:

NFV-IFA 011 provides requirements for the structure and format of a VNF Package to describe the VNF properties and associated resource requirements in an interoperable template. The focus is on VNF packaging, meta-model descriptors (e.g. VNFD) and package integrity and security considerations. 
Supporting
Organizations
Docomo, Ericsson, Nokia, Orange, PT Portugal, ZTE 

 

Keywords Projects Clusters Frequencies Mandates Directives
  MANAGEMENT
MANO
NFV
orchestration
Virtualisation
NFV_Release4
Networks
     
Official Journal
     
Remarks
2024-01-03 neagn WI Revision. 1 WI created with Ref: RGS/NFV-IFA011ed461. Comments copied = No, Schedule copied = Default
2023-11-15 neagn WI Revision. 1 WI created with Ref: RGS/NFV-IFA011ed511. Comments copied = No, Schedule copied = Default
2023-09-11 neagn TB approval proposal in contribution NFV(23)000173 was Accepted by NFV (see RC NFV(23)DEC284)
2023-08-03 kalyan Draft contributed - V 4.4.4 contributed for Decision in NFV(23)000173 as Final draft for approval
2023-08-02   Status updated - V 4.4.4 with status: Final draft for approval
2023-07-28   A new draft is uploaded - V 4.4.4 with status: Stable draft
2023-07-26   A new draft is uploaded - V 4.4.3 with status: Stable draft
2023-04-13 xiaha Early draft proposal in contribution NFVIFA(23)000235 was Noted by NFV IFA
2023-04-03 bhyrraju Draft contributed - V 4.4.2 contributed for Information in NFVIFA(23)000235 as Early draft
2023-04-03 bhyrraju A new draft is uploaded - V 4.4.2 with status: Early draft
 
Displaying Item 33 of 60...

ETSI Home Page Any comments or problems with this application? Please let us know...