2024-03-28 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DGR/THz-004' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  DGR/THz-004 GR THz 004   THz
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Early draft (2024-03-06) 0.0.3 Draft   View Standstill Information 2022-12-16
  Rapporteur Technical Officer Harmonised Standard
  Sharad Sambhwani Nicolae Madalin Neag No
 
Title TeraHertz technology (THz); RF Hardware Modeling
RF Hardware Modeling 
Scope and Field
of Application
This work item will: (i) Assess the state-of-the-art materials for THz communication e.g., electronics, photonics, plasmonics (ii) Study the feasibility of different channel bandwidths considering component technologies, circuits and systems (iii) Study the effects of non-linear and frequency selective hardware (iv) Characterize RF/analog impairments based on simulations/measurements and obtain suitable RF impairment models in THz frequency range (v) Study low complexity large antenna array and packaging technologies (vi) Assess overall device complexity and cost impact (vii) Study the state of art for RF subsystems (transceiver, front end, antenna) in the THz frequency range (viii) Study the energy efficiency of state-of-the-art materials and RF subsystems on transmission and/or reception. 
Supporting
Organizations
Apple France, B-Com, HUAWEI TECH. GmbH, InterDigital, Europe, Ltd., TUBS.digital 

 

Keywords Projects Clusters Frequencies Mandates Directives
  channel bandwidths
cost impact
device complexity
frequency range
large antenna array
RF HW models
RF/analog impairments
THz component technologies
THz materials
transceiver efficiency
  Networks
Wireless Systems
     
Official Journal
     
Remarks
2024-03-06 sambhwanisha Draft contributed - V 0.0.3 contributed for Information in THz(24)000050 as Early draft
2024-03-06   A new draft is uploaded - V 0.0.3 with status: Early draft
2023-06-21 sambhwanisha Draft contributed - V 0.0.2 contributed for Decision in THz(23)000146 as Early draft
2023-06-21   A new draft is uploaded - V 0.0.2 with status: Early draft - with comment: Based on agreed upon Document Structure in THz(23)000059
2023-06-18 sambhwanisha Early draft proposal in contribution THz(23)000143 was Revised by THz
2023-06-18 sambhwanisha Draft contributed - V 0.0.1 contributed for Decision in THz(23)000143 as Early draft
2023-02-04 sambhwanisha Draft contributed - V 0.0.1 contributed for Decision in THz(23)000027 as Early draft
2023-02-04   A new draft is uploaded - V 0.0.1 with status: Early draft
2023-01-16 SAMBHWAN TB adoption of WI THz, see contribution THz(22)001_022 in RC THz(22)DEC004
2022-12-16 SAMBHWAN WI proposed to TB THz, see contribution THz(22)001_022
 
Displaying Item 7 of 725...

ETSI Home Page Any comments or problems with this application? Please let us know...