2024-03-28 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DGS/NFV-IFA052' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DGS/NFV-IFA052 (PDF Format) Download standrd ref:
DGS/NFV-IFA052 (Word Format)
  DGS/NFV-IFA052 GS NFV-IFA 052   NFV IFA
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2023-08-24) 4.5.1 2023-08-24 View Standstill Information 2022-09-15
  Rapporteur Technical Officer Harmonised Standard
  Haitao Xia Nicolae Madalin Neag No
 
Title Network Functions Virtualisation (NFV) Release 4; Management and Orchestration; CCM-VIM Interoperability Interface and Information Model Specification
CCM-VIM interface spec 
Scope and Field
of Application
The work item specifies the interfaces supported for interoperability between the CCM and VIM in the NFV-MANO architectural framework ETSI GS NFV 006, as well as information elements exchanged over these interfaces, to support the provisioning and management of resources for CIS clusters. The work item will take as input (e.g., profile and/or reference) the ETSI GS NFV-IFA 005 and ETSI GS NFV-IFA 006 specifications. Whether this specification will take into account resource management requirements for bare-metal CIS clusters will follow the recommendations developed in other features handling aspects regarding physical infrastructure management (e.g., FEAT27 on “NFV support for vRAN”, FEAT29 on “Green NFV”). 
Supporting
Organizations
Orange, China Telecommunications, ZTE Corporation, DOCOMO Communications Lab., Huawei Tech.(UK) Co.. Ltd 

 

Keywords Projects Clusters Frequencies Mandates Directives
  CCM
CONFIGURATION
INFORMATION MODEL
MANAGEMENT
MANO
VIM
NFV_Release4
Networks
     
Official Journal
     
Remarks
2023-11-15 neagn WI Revision. 1 WI created with Ref: DGS/NFV-IFA052ed511. Comments copied = No, Schedule copied = Default
2023-08-23 neagn TB approval proposal in contribution NFV(23)000153 was Accepted by NFV (see RC NFV(23)DEC281)
2023-07-13 xiaha Draft contributed - V 0.2.0 contributed for Decision in NFV(23)000153 as Final draft for approval
2023-07-06 xiaha A new draft is uploaded - V 0.2.0 with status: Final draft for approval
2023-06-06 xiaha A new draft is uploaded - V 0.1.0 with status: Stable draft
2023-03-16 xiaha A new draft is uploaded - V 0.0.2 with status: Early draft
2023-01-05 xiaha A new draft is uploaded - V 0.0.1 with status: Early draft
2022-12-12 XIAHA TB adoption of WI NFV, see contribution NFV(22)000194r6
2022-12-09 XIAHA WI proposed to WG NFV IFA, see contribution NFV(22)000194r6
2022-12-09 XIAHA WI proposed to WG NFV IFA, see contribution NFV(22)000194r5
2022-12-09 XIAHA WI proposed to WG NFV IFA, see contribution NFV(22)000194r4
2022-12-09 XIAHA WI proposed to WG NFV IFA, see contribution NFV(22)000194r3
2022-12-08 XIAHA WI proposed to WG NFV IFA, see contribution NFV(22)000194r2
2022-09-16 XIAHA WI proposed to WG NFV IFA, see contribution NFV(22)000194r1
2022-09-15 XIAHA WI proposed to TB NFV, see contribution NFV(22)000194
 
Displaying Item 55 of 60...

ETSI Home Page Any comments or problems with this application? Please let us know...