2024-03-29 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DGR/NFV-EVE021' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DGR/NFV-EVE021 (PDF Format) Download standrd ref:
DGR/NFV-EVE021 (Word Format)
  DGR/NFV-EVE021 GR NFV-EVE 021   NFV EVE
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2023-09-25) 5.1.1 2023-09-25 View Standstill Information 2021-07-16
  Rapporteur Technical Officer Harmonised Standard
  Joan Triay Nicolae Madalin Neag No
 
Title Network Functions Virtualisation (NFV) Release 5; Evolution and Ecosystem; Report on energy efficiency aspects for NFV
Green-NFV_report 
Scope and Field
of Application
The work item will investigate the aspects of NFV that have an impact on power consumption and energy efficiency, such as:
- the design and runtime characteristics of the NFV framework, including VNF, NFVI, NFV-MANO, etc. which can influence energy consumption.
- the deployment configuration of NFV-MANO systems and their optimization in various scenarios such as small footprint but highly distributed deployments, and
- the mechanisms that can enable smart energy usage and decision making in NFV considering NFV capabilities such as orchestration and automation.
The work item will identify and provide recommendations for normative and/or other informative work. The work item is expected to leverage the work done in relevant organizations such as ETSI EE and 3GPP. The resulting deliverable will be informative. 
Supporting
Organizations
Orange, PT PORTUGAL SGPS SA, TELEFONICA S.A., ZTE Corporation, DOCOMO Communications Lab., Huawei Tech.(UK) Co.. Ltd 

 

Keywords Projects Clusters Frequencies Mandates Directives
  Energy Efficiency
MANAGEMENT
NFV
NFV_Release5
Networks
     
Official Journal
     
Remarks
2023-09-14 neagn TB approval proposal in contribution NFV(23)000175 was Accepted by NFV (see RC NFV(23)DEC285)
2023-08-07 triay Draft contributed - V 0.15.0 contributed for Decision in NFV(23)000175 as Final draft for approval
2023-08-07 triay A new draft is uploaded - V 0.15.0 with status: Final draft for approval
2023-07-03 triay A new draft is uploaded - V 0.14.0 with status: Stable draft - with comment: Stable draft version for WG final review.
2023-06-26 triay A new draft is uploaded - V 0.13.0 with status: Early draft
2023-05-26 triay A new draft is uploaded - V 0.12.0 with status: Early draft
2023-05-08 triay A new draft is uploaded - V 0.11.0 with status: Early draft
2023-04-11 triay A new draft is uploaded - V 0.10.1 with status: Early draft
2023-03-20 triay A new draft is uploaded - V 0.10.0 with status: Early draft
2022-12-19 triay A new draft is uploaded - V 0.9.0 with status: Early draft
2022-12-12 triay A new draft is uploaded - V 0.8.0 with status: Early draft
2022-10-14 triay A new draft is uploaded - V 0.7.0 with status: Early draft
2022-08-23 triay A new draft is uploaded - V 0.6.0 with status: Early draft
2022-06-13 triay A new draft is uploaded - V 0.5.0 with status: Early draft
2022-04-21 triay A new draft is uploaded - V 0.4.0 with status: Early draft
2022-03-17 triay A new draft is uploaded - V 0.3.0 with status: Early draft
2022-03-11 triay A new draft is uploaded - V 0.2.0 with status: Early draft
2022-01-13 triay A new draft is uploaded - V 0.1.0 with status: Early draft - with comment: Implementation of contributions approved at EVE_174 and agreed at EVE_179.
2021-10-04 triay A new draft is uploaded - V 0.0.1 with status: Early draft
2021-08-06 TRIAY TB adoption of WI NFV, see contribution NFV(21)000156r1 in RC NFV(21)DEC187
2021-07-20 TRIAY WI proposed to WG NFV EVE, see contribution NFV(21)000156r1
2021-07-16 TRIAY WI proposed to TB NFV, see contribution NFV(21)000156
 

Specific aspects
  Environmental aspects
  Displaying Item 83 of 95...
 

ETSI Home Page Any comments or problems with this application? Please let us know...