2024-03-29 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RGR/ENI-0010v121_AI_App_Net' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  RGR/ENI-0010v121_AI_App_Net GR ENI 010   ENI
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Final draft for approval (2024-03-22) 0.0.10 Draft   View Standstill Information 2021-06-15
  Rapporteur Technical Officer Harmonised Standard
  Yu Zeng Christine Mera No
 
Title Experiential Networked Intelligence (ENI); Evaluation of categories for AI application to Networks
 
Scope and Field
of Application
The present document revises GR ENI 010 to further: (1) investigate quantitative evaluation criteria of network autonomicity categories, (2) perform a deeper research of more quantitative factors that determine those categories, (3) define an accurate scoring criteria that complies with the evolution of the ENI architecture and (4) define a data model covering an entire operator's network or just a specific domain.
This deeper research will be complemented by the description of several example scenarios where the quantitative factors and the scoring evaluation criteria will be illustrated. This can be done by analysing the relationship among network KPIs of different levels, e.g. between the network infrastructure capabilities and the network intelligence levels. 
Supporting
Organizations
Huawei Technologies Limited (UK);Portugal Telecom PT SGPS;China Telecom Corporation;CAICT 

 

Keywords Projects Clusters Frequencies Mandates Directives
  artificial intelligence
categorization
NETWORK
  Networks
     
Official Journal
     
Remarks
2024-03-22 forbesra Draft contributed - V 0.0.10 contributed for Decision in ENI(24)000_072 as Final draft for approval
2024-03-22 forbesra A new draft is uploaded - V 0.0.10 with status: Final draft for approval - with comment: Review for approval set to 8th April 2024
2024-03-06 forbesra Draft contributed - V 0.0.9 contributed for Decision in ENI(24)000_048 as Stable draft
2024-03-06 forbesra A new draft is uploaded - V 0.0.9 with status: Stable draft - with comment: ENI_20 for clean up
2023-12-15 forbesra Draft contributed - V 0.0.8 contributed for Information in ENI(24)000_001 as Stable draft
2023-12-14 forbesra A new draft is uploaded - V 0.0.8 with status: Stable draft - with comment: in ENI_28
2023-09-07 forbesra Draft contributed - V 0.0.7 contributed for Information in ENI(23)000_140 as Early draft
2023-09-07 forbesra A new draft is uploaded - V 0.0.7 with status: Early draft - with comment: At ENI_27
2023-08-08 forbesra Draft contributed - V 0.0.6 contributed for Information in ENI(23)000_121 as Early draft
2023-05-05 forbesra Draft contributed - V 0.0.6 contributed for Information in ENI(23)026_021 as Early draft
2023-02-17 forbesra Draft contributed - V 0.0.6 contributed for Information in ENI(23)025_017 as Early draft
2022-12-22 forbesra Draft contributed - V 0.0.6 contributed for Information in ENI(23)000_001 as Early draft
2022-09-09 forbesra Draft contributed - V 0.0.6 contributed for Information in ENI(22)000_190 as Early draft
2022-09-08 forbesra A new draft is uploaded - V 0.0.6 with status: Early draft - with comment: Approved in ENI_23
2022-09-07 zeng1 Draft contributed - V 0.0.5 contributed for Information in ENI(22)023_010r1 as Early draft
2022-09-07 zeng1 Early draft proposal in contribution ENI(22)023_010 was Revised by ENI
2022-08-09 forbesra Draft contributed - V 0.0.5 contributed for Information in ENI(22)023_010 as Early draft
2022-06-24 forbesra Draft contributed - V 0.0.5 contributed for Information in ENI(22)000_139 as Early draft
2022-06-24 forbesra A new draft is uploaded - V 0.0.5 with status: Early draft - with comment: Approved in ENI_22
2022-06-07 forbesra Draft contributed - V 0.0.4 contributed for Decision in ENI(22)022_009r1 as Early draft
2022-06-07 artigiania Early draft proposal in contribution ENI(22)022_009 was Revised by ENI
2022-05-31 forbesra Draft contributed - V 0.0.4 contributed for Information in ENI(22)022_009 as Early draft
2022-03-10 forbesra Draft contributed - V 0.0.4 contributed for Information in ENI(22)000_072 as Early draft
2022-03-02 forbesra Draft contributed - V 0.0.4 contributed for Information in ENI(22)021_010 as Early draft
2021-11-17 forbesra Draft contributed - V 0.0.4 contributed for Information in ENI(21)000_245 as Early draft
2021-10-25 forbesra Draft contributed - V 0.0.4 contributed for Information in ENI(21)000_215 as Early draft
2021-08-31 forbesra Draft contributed - V 0.0.4 contributed for Information in ENI(21)019_025 as Early draft
2021-08-03 forbesra Draft contributed - V 0.0.4 contributed for Information in ENI(21)000_169 as Early draft
2021-08-03 forbesra A new draft is uploaded - V 0.0.4 with status: Early draft - with comment: Call_184
2021-08-03 forbesra A new draft is uploaded - V 0.0.3 with status: Early draft - with comment: Call_188
2021-06-22 forbesra Draft contributed - V 0.0.2 contributed for Information in ENI(21)000028 as Early draft
2021-06-22 forbesra A new draft is uploaded - V 0.0.2 with status: Early draft - with comment: Baseline from ENI_18 ENI(21)018_007
 
Displaying Item 6 of 72...

ETSI Home Page Any comments or problems with this application? Please let us know...