2024-03-28 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RGR/NFV-TST006ed121' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
RGR/NFV-TST006ed121 (PDF Format) Download standrd ref:
RGR/NFV-TST006ed121 (Word Format)
  RGR/NFV-TST006ed121 GR NFV-TST 006   NFV TST
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2022-12-21) 1.2.1 2022-12-21 View Standstill Information 2020-10-14
  Rapporteur Technical Officer Harmonised Standard
  Chuyi Guo Laurent Vreck No
 
Title Network Functions Virtualisation (NFV); Testing; Report on CICD and DevOps
CICD & Devops report 
Scope and Field
of Application
This revision of NFV-TST 006 will extend the current scope of the report to analyze and provide recommendations on how to enhance the support for joint delivery pipeline. NFV-TST 006 provides guidance and recommendations on methods to leverage DevOps and CI/CD techniques across the VNF provider to service provider boundary, or any combination of developer, installation and operational entities. It outlines the implications of the processes with regard to the impact of the VNF package handoff between VNF provider and service provider, the required functionality in the NFV system, the different deployment and operational options by: a) exploring use cases, b) defining the steps in the process, c) defining the metrics and measurements, d) defining the test procedures, e) defining post handoffs tests, and f) providing recommendations on VNF Package. 
Supporting
Organizations
Keysight Technologies UK Ltd, HUAWEI TECHNOLOGIES Co. Ltd., Spirent Communications, China Telecommunications, ZTE Corporation, Telefonica 

 

Keywords Projects Clusters Frequencies Mandates Directives
  CI/CD
DevOps
NFV
NFVI
SDN
  Networks
     
Official Journal
     
Remarks
2022-12-05 neagn TB approval proposal in contribution NFV(22)000234 was Accepted by NFV (see RC NFV(22)DEC243)
2022-11-03 zhangyuh Draft contributed - V 0.0.6 contributed for Decision in NFV(22)000234 as Final draft for approval
2022-10-12 zhangyuh A new draft is uploaded - V 0.0.6 with status: Final draft for approval
2022-05-30 guochc A new draft is uploaded - V 0.0.5 with status: Early draft
2021-01-06 linghhu Draft contributed - V 0.0.4 contributed for Decision in NFVTST(20)000092r3 as Early draft
2021-01-06   A new draft is uploaded - V 0.0.4 with status: Early draft
2021-01-06 linghhu Early draft proposal in contribution NFVTST(20)000092r2 was Revised by NFV TST
2020-12-04 linghhu Draft contributed - V 0.0.3 contributed for Decision in NFVTST(20)000092r2 as Early draft
2020-12-04 linghhu Early draft proposal in contribution NFVTST(20)000092r1 was Revised by NFV TST
2020-12-04   A new draft is uploaded - V 0.0.3 with status: Early draft - with comment: Upload first draft with the valid format
2020-12-02 linghhu Draft contributed - V 0.0.2 contributed for Decision in NFVTST(20)000092r1 as Early draft
2020-12-02   A new draft is uploaded - V 0.0.2 with status: Early draft
2020-12-02 linghhu Early draft proposal in contribution NFVTST(20)000092 was Revised by NFV TST
2020-11-30 linghhu Draft contributed - V 0.0.1 contributed for Decision in NFVTST(20)000092 as Early draft
2020-11-30   A new draft is uploaded - V 0.0.1 with status: Early draft - with comment: On the basis of the content and structure of the existing version of TST006, this Draft inserted the related NOTEs to describe the content that the revision version planned to...
2020-11-02 linghhu TB adoption of WI NFV, see contribution NFV(20)000216 in RC NFV(20)DEC150
2020-10-14 linghhu WI proposed to TB NFV, see contribution NFV(20)000216
 

Specific aspects
  User/consumer aspects
Displaying Item 6 of 95...

ETSI Home Page Any comments or problems with this application? Please let us know...