2024-03-28 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DEN/ERM-TGUWB-605EN 305 550-5' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  DEN/ERM-TGUWB-605EN 305 550-5 EN 305 550-5   ERM TGUWB
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Stable draft (2022-03-24) 0.1.0 Draft   View Standstill Information 2020-05-11
  Rapporteur Technical Officer Harmonised Standard
  Maik Stemme Guillermo Vietti Yes
 
Title Short Range Devices (SRD) to be used in the 40 GHz to 260 GHz frequency range Harmonised Standard for access to radio spectrum Part 5: Ultra Short Range Communication Device (USRCD) within 57 GHz to 64 GHz
USRCD mmW communication 
Scope and Field
of Application
This EN will cover Ultra Short Range Communication Devices (USRCD) to be used in the the 57 GHz to 64 GHz frequency range. This includes a detailed description of the wanted performance requirement, RX-requirements and fixed limits for all requirements (TX/RX) based on a clear test procedure. Equipment covered by the present document operates in accordance with EC DEC 2019/1345 (band 74a) 
Supporting
Organizations
ROBERT BOSCH GmbH, ROHDE & SCHWARZ, Phoenix Contact GmbH & Co. KG, Phoenix Testlab GmbH, 2pi-Labs GmbH 

 

Keywords Projects Clusters Frequencies Mandates Directives
  RADIO
radio measurements
SRD
  Better Living with ICT
Connecting Things
Home & Office
Wireless Systems
Non-specific SRDs (40 GHz to 125 GHz)
M/536
2014/53/EU
Official Journal
     
Remarks
2022-10-21 mahler Stable draft proposal in contribution ERMTGUWB(22)60b014 was Noted by ERM TGUWB
2022-10-21 mahler Stable draft proposal in contribution ERMTGUWB(22)60b015 was Rejected by ERM TGUWB
2022-03-24 mahler Draft contributed - V 0.1.0 contributed for Decision in ERMTGUWB(22)60b015 as Stable draft
2022-03-24 mahler A new draft is uploaded - V 0.1.0 with status: Stable draft - with comment: for TGUWB_60 adhoc to approve for 1st HASTAC assessment
2022-03-23 mahler Draft contributed - V 0.0.9 contributed for Decision in ERMTGUWB(22)60b014 as Stable draft
2022-03-23 mahler A new draft is uploaded - V 0.0.9 with status: Stable draft - with comment: updated draft based on last rapporteur drafting
2022-03-15 mahler Early draft proposal in contribution ERMTGUWB(22)USC003 was Noted by ERM TGUWB
2022-03-15 mahler Draft contributed - V 0.0.8 contributed for Information in ERMTGUWB(22)USC003 as Early draft
2022-03-15 mahler A new draft is uploaded - V 0.0.8 with status: Early draft - with comment: outcome rapporteur meeting 15 March 2022
2022-02-16 mahler Stable draft proposal in contribution ERMTGUWB(22)000001r1 was Noted by ERM TGUWB
2022-02-16 mahler Early draft proposal in contribution ERMTGUWB(22)060011 was Noted by ERM TGUWB
2022-02-16 mahler Draft contributed - V 0.0.7 contributed for Discussion in ERMTGUWB(22)000001r1 as Stable draft
2022-02-16 mahler Early draft proposal in contribution ERMTGUWB(22)000001 was Revised by ERM TGUWB
2022-02-16 mahler A new draft is uploaded - V 0.0.7 with status: Stable draft - with comment: outcome TG UWB_60 discussion
2022-01-28 stemme Draft contributed - V 0.0.6 contributed for Discussion in ERMTGUWB(22)000001 as Early draft
2022-01-28 stemme A new draft is uploaded - V 0.0.6 with status: Early draft
2022-01-25 mahler A new draft is uploaded - V 0.0.5 with status: Early draft - with comment: corrected numbering
2022-01-21 mahler Early draft proposal in contribution ERMTGUWB(22)USC001 was Noted by ERM TGUWB
2022-01-20 mahler Draft contributed - V 0.0.4 contributed for Decision in ERMTGUWB(22)060011 as Early draft
2022-01-20 mahler A new draft is uploaded - V 0.0.4 with status: Early draft - with comment: outcome rapporteur meeting 19th Jan 2022
2022-01-14 stemme Draft contributed - V 0.0.3 contributed for Discussion in ERMTGUWB(22)USC001 as Early draft
2022-01-14 stemme A new draft is uploaded - V 0.0.3 with status: Early draft
2021-11-18 mahler Early draft proposal in contribution ERMTGUWB(21)059025 was Noted by ERM TGUWB
2021-11-07 stemme Draft contributed - V 0.0.2 contributed for Discussion in ERMTGUWB(21)059025 as Early draft
2021-11-07 stemme A new draft is uploaded - V 0.0.2 with status: Early draft
2020-09-25 mahler Preliminary Draft proposal in contribution ERMTGUWB(20)000048 was Noted by ERM TGUWB
2020-09-23 steinerbe Draft contributed - V 0.0.1 contributed for Discussion in ERMTGUWB(20)000048 as Preliminary Draft
2020-09-23 steinerbe A new draft is uploaded - V 0.0.1 with status: Preliminary Draft
2020-06-12 MAHLER TB adoption of WI ERM, see contribution ERM(20)70b008 in RC ERM(20)DEC789
2020-05-11 MAHLER WI proposed to WG ERM TGUWB, see contribution ERM(20)70b008
2020-05-11 MAHLER WI accepted by WG ERM TGUWB, see contribution ERMTGUWB(20)053026
2020-05-11 MAHLER WI proposed to WG ERM TGUWB, see contribution ERMTGUWB(20)053026
 

Specific aspects
  User/consumer aspects
  Displaying Item 1 of 411...

ETSI Home Page Any comments or problems with this application? Please let us know...