2024-04-19 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DGS/PDL-005_DLT_PoC' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DGS/PDL-005_DLT_PoC (PDF Format) Download standrd ref:
DGS/PDL-005_DLT_PoC (Word Format)
  DGS/PDL-005_DLT_PoC GS PDL 005   PDL
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2020-03-16) 1.1.1 2020-03-16 View Standstill Information 2019-12-20
  Rapporteur Technical Officer Harmonised Standard
  Raymond Forbes Christine Mera No
 
Title Permissioned Distributed Ledger (PDL); Proof of Concepts Framework
 
Scope and Field
of Application
The present document specifies a framework for use within ETSI PDL ISG to coordinate and promote public demonstrations of Proof of Concept (PoC) validating key technical components developed in PDL.
The objective for the PoCs is to build commercial awareness and confidence and encourage development of an open ecosystem by integrating components from different players.
 
Supporting
Organizations
Ericsson LM, NEC Europe Ltd, TELEFONICA S.A., Huawei Tech.(UK) Co., Ltd, King's College London (KCL) 

 

Keywords Projects Clusters Frequencies Mandates Directives
  INTEROPERABILITY
Proof of Concept
TESTING
  Interoperability
Security
     
Official Journal
     
Remarks
2020-02-12 forbesra Final draft for approval proposal in contribution PDL(20)004_016 was Accepted by PDL
2020-02-11 forbesra Draft contributed - V 0.1.2 contributed for Decision in PDL(20)004_016 as Final draft for approval
2020-02-11 forbesra A new draft is uploaded - V 0.1.2 with status: Final draft for approval - with comment: as approved in PDL_04
2020-02-11 forbesra Final draft for approval proposal in contribution PDL(20)004_008 was Revised by PDL
2020-02-06 forbesra Status updated - V 0.1.1 with status: Final draft for approval
2020-02-06 forbesra Draft contributed - V 0.1.1 contributed for Decision in PDL(20)004_008 as Early draft
2020-02-06 forbesra A new draft is uploaded - V 0.1.1 with status: Early draft - with comment: as agreed in call_22
2020-01-27 forbesra Draft contributed - V 0.1.0 contributed for Decision in PDL(20)004_005 as Stable draft
2020-01-27 forbesra A new draft is uploaded - V 0.1.0 with status: Stable draft - with comment: uploaded 4 weeks before PDL_04 up issued after edit help
2020-01-09 forbesra Stable draft proposal in contribution PDL(20)004_004 was Revised by PDL
2020-01-09 forbesra Draft contributed - V 0.0.2 contributed for Decision in PDL(20)004_004 as Stable draft
2020-01-09 forbesra A new draft is uploaded - V 0.0.2 with status: Stable draft - with comment: As agreed in ConfCall_20 Stability review until 16_01_2020
2020-01-09 forbesra Status updated - V 0.0.1 with status: Early draft
2020-01-09 forbesra Status updated - V 0.0.1 with status: Stable draft - with comment: AS agreed in Confcall_20 Stability review until 18_01_2020
2020-01-09 MERA TB adoption of WI PDL, see contribution PDL(20)000005
2020-01-09 forbesra Draft contributed - V 0.0.1 contributed for Decision in PDL(20)000010 as Preliminary Draft
2020-01-09 forbesra A new draft is uploaded - V 0.0.1 with status: Preliminary Draft - with comment: Initial draft
2019-12-20 MERA WI proposed to TB PDL, see contribution PDL(20)000005
 
Displaying Item 2 of 61...

ETSI Home Page Any comments or problems with this application? Please let us know...