2024-03-28 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DGR/NFV-IFA035' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DGR/NFV-IFA035 (PDF Format) Download standrd ref:
DGR/NFV-IFA035 (Word Format)
  DGR/NFV-IFA035 GR NFV-IFA 035   NFV IFA
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2023-10-04) 5.1.1 2023-10-04 View Standstill Information 2019-09-13
  Rapporteur Technical Officer Harmonised Standard
  Hammad Zafar Nicolae Madalin Neag No
 
Title Network Functions Virtualisation (NFV) Release 5; Architectural Framework; Report on network connectivity integration and operationalization for NFV
Network_connectivity_and_NFV_report 
Scope and Field
of Application
Derived from the past deliverables (e.g. INF005, EVE005 and IFA022), this work item will report about issues when it comes to fulfilling VNF networking requirements with the NFV framework. The work item will analyse the integration and operation for virtual networking and SDN usage. Recent advances available in networking infrastructure will be considered in the study. Areas of study include interactions on the [NF-Vi]/N, network provisioning across network domain boundaries, efficient interworking of overlay and underlay network provisioning, and management and operations for Connectivity Service with recent traffic engineering technologies.
The deliverable will collect use cases and, based on them, recommendations on normative work will be made.The deliverable will be informative.
 
Supporting
Organizations
Nokia Corporation, NEC Europe Ltd, TELECOM ITALIA S.p.A., NTT corporation, ZTE Corporation, DOCOMO Communications Lab., Huawei Tech.(UK) Co.. Ltd 

 

Keywords Projects Clusters Frequencies Mandates Directives
  API
MANAGEMENT
MANO
NFV
NFV_Release5
Networks
     
Official Journal
     
Remarks
2023-10-02 neagn Final draft for approval proposal in contribution NFV(23)000185 was Accepted by NFV
2023-08-21 zafarh Draft contributed - V 0.18.0 contributed for Decision in NFV(23)000185 as Final draft for approval
2023-08-14   A new draft is uploaded - V 0.18.0 with status: Final draft for approval
2023-08-02   A new draft is uploaded - V 0.17.1 with status: Stable draft
2023-07-04   A new draft is uploaded - V 0.17.0 with status: Stable draft
2023-05-08   A new draft is uploaded - V 0.16.0 with status: Early draft
2023-03-15   A new draft is uploaded - V 0.15.0 with status: Early draft
2023-01-10   A new draft is uploaded - V 0.14.0 with status: Early draft - with comment: This is the new early draft v0.14.0 for ETSI GR NFV-IFA035 based on draft contribution NFVIFA(23)000015.
2022-10-17   A new draft is uploaded - V 0.13.0 with status: Early draft - with comment: Thi
2022-09-12 vreck Rapporteur changed from Zarrar Yousaf (NEC) to Hammad Zafar (NEC)
2022-08-24 yousaf A new draft is uploaded - V 0.12.0 with status: Early draft - with comment: Based on draft contribution NFVIFA(22)000590
2022-07-19 yousaf A new draft is uploaded - V 0.11.0 with status: Early draft - with comment: Based on draft contribution NFVIFA(22)000522
2022-06-20 yousaf A new draft is uploaded - V 0.10.0 with status: Early draft - with comment: Based draft contribution NFVIFA(22)000401
2022-04-05 yousaf A new draft is uploaded - V 0.9.0 with status: Early draft - with comment: Based on draft contribution NFVIFA(22)000236
2022-01-31 yousaf A new draft is uploaded - V 0.8.0 with status: Early draft - with comment: Based on draft contribution NFVIFA(22)000051
2021-11-18 yousaf A new draft is uploaded - V 0.7.0 with status: Early draft - with comment: Based on draft contribution NFVIFA(21)000980
2021-10-04 yousaf A new draft is uploaded - V 0.6.0 with status: Early draft - with comment: Based on draft contribution NFVIFA(21)000847
2021-01-16 yousaf A new draft is uploaded - V 0.5.0 with status: Early draft - with comment: Basedon draft contribution NFVIFA(21)000024
2020-11-20 yousaf A new draft is uploaded - V 0.4.0 with status: Early draft - with comment: Based on draft contribution NFVIFA(20)000806
2020-07-22 yousaf A new draft is uploaded - V 0.3.0 with status: Early draft - with comment: Based on draft contribution NFVIFA(20)000538
2020-04-17 yousaf A new draft is uploaded - V 0.2.0 with status: Early draft - with comment: Based on draft contribution NFVIFA(20)000289
2019-12-13 yousaf A new draft is uploaded - V 0.1.0 with status: Early draft - with comment: Based on DRAFT contribution NFVIFA(19)0001033
2019-10-02 YOUSAF TB adoption of WI NFV, see contribution NFV(19)000228r4
2019-09-27 YOUSAF WI proposed to WG NFV IFA, see contribution NFV(19)000228r4
2019-09-27 YOUSAF WI proposed to WG NFV IFA, see contribution NFV(19)000228r3
2019-09-26 YOUSAF WI proposed to WG NFV IFA, see contribution NFV(19)000228r2
2019-09-13 YOUSAF WI proposed to WG NFV IFA, see contribution NFV(19)000228r1
2019-09-13 YOUSAF WI proposed to TB NFV, see contribution NFV(19)000228
 
Displaying Item 36 of 78...

ETSI Home Page Any comments or problems with this application? Please let us know...