2024-03-29 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RGS/NFV-IFA010ed331' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
RGS/NFV-IFA010ed331 (PDF Format) Download standrd ref:
RGS/NFV-IFA010ed331 (Word Format)
  RGS/NFV-IFA010ed331 GS NFV-IFA 010   NFV IFA
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2019-09-13) 3.3.1 2019-09-13 View Standstill Information 2019-04-30
  Rapporteur Technical Officer Harmonised Standard
  Ulrich Kleber Laurent Vreck No
 
Title Network Functions Virtualisation (NFV) Release 3; Management and Orchestration; Functional requirements specification
MANO Functional Rqmts Spec 
Scope and Field
of Application
This revision of NFV-IFA 010 continues the development of the specification as part of the NFV Release 3.
This edition will add functional requirements for NFV-MANO to support the Release 3 features, and it will extend the scope of the former Release 2 edition summarized hereafter:

This WI aims for a NFV Phase 2 deliverable containing all the normative functional requirements for NFV management and orchestration e.g. to support VNF migration, VNF Healing, Health-check.
The following aspects need to be considered (in-scope) while developing such a deliverable
- Consolidating all the functional requirements scattered in various phase 1 GSs (SWA GS, REL GS, INF GSs, MAN GS, NFV004) for management and orchestration. ISG level requirements from NFV004 should be considered as default requirement for phase 2 unless specific corrections to certain requirements are agreed in ISG level.
- Refining functional requirements for concepts defined in Phase 1
The target deliverable is a requirement GS which will be fulfilled by NFV management and orchestration interface normative work. The other interface normative WI can progress in parallel. The functional requirements on interfaces and models related to interfaces are not in scope of this WI. The final deliverable will contain normative provisions.

This revision of NFV-IFA 010 will address the Release 3 candidate features listed in Annex B of the Release 3 Definition. Where needed, it will continue the previous version to enhance and complete the specified Release 3 features.
This revision will reflect the maintenance performed to NFV Release 2 documentation and of already specified Release 3 features. 
Supporting
Organizations
Huawei, PT Portugal, Orange, Telefonica, DOCOMO, ZTE 

 

Keywords Projects Clusters Frequencies Mandates Directives
  FUNCTIONAL
MANAGEMENT
MANO
NFV
orchestration
Requirements
Virtualisation
NFV_R3_2019H1_Maintenance
Networks
     
Official Journal
     
Remarks
2019-09-24 vreck WI Revision. 1 WI created with Ref: RGS/NFV-IFA010ed341. Comments copied = No, Schedule copied = Default
2019-08-22 schmidth TB approval proposal in contribution NFV(19)000185 was Accepted by NFV (see RC NFV(19)DEC112)
2019-07-17 kleberu Draft contributed - V 3.2.4 contributed for Decision in NFV(19)000185 as Final draft for approval
2019-07-17 kleberu A new draft is uploaded - V 3.2.4 with status: Final draft for approval
2019-06-27 kleberu A new draft is uploaded - V 3.2.3 with status: Early draft
2019-05-10 kleberu A new draft is uploaded - V 3.2.2 with status: Early draft - with comment: Baseline for ed331 Release 3 drop 3
2019-04-30 vreck Super WID in NFV(19)000072r1
 
Displaying Item 48 of 70...

ETSI Home Page Any comments or problems with this application? Please let us know...