2024-03-28 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DTS/ESI-0019322' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DTS/ESI-0019322 (PDF Format) Download standrd ref:
DTS/ESI-0019322 (Word Format)
  DTS/ESI-0019322 TS 119 322   ESI
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2022-11-18) 1.1.1 2022-11-18 View Standstill Information 2019-03-27
  Rapporteur Technical Officer Harmonised Standard
  Benny Birnbaum Sonia Compans No
 
Title Electronic Signatures and Infrastructure (ESI); Schema for machine-readable cryptographic algorithms, and cipher suites catalogues
Schema for machine-readable cryptographic algorithm catalogues 
Scope and Field
of Application
Definition of a generic schema for a machine-readable cryptographic algorithm catalogue to reflect requirements posed by existing human-readably algorithm (and cipher suites) catalogues, increase interoperability, and support backwards compatibility for long-term preservation systems. It will be based on RFC 5698. This work item will itself not define the requirements for algorithms or/and cypher suites. 
Supporting
Organizations
BMWi, Cryptolog International, Nimbus Technologieberatung, TU Graz, Ministry of Transport and Cons, TeleTrusT 

 

Keywords Projects Clusters Frequencies Mandates Directives
  ALGORITHM
INTEROPERABILITY
SECURITY
  Interoperability
Security
     
Official Journal
     
Remarks
2022-10-13 compans TB approval proposal in contribution ESI(22)078054 was Accepted by ESI (see RC ESI(22)DEC272)
2022-09-21 birnbaum Draft contributed - V 0.0.9 contributed for Decision in ESI(22)078054 as Final draft for approval
2022-09-21 birnbaum A new draft is uploaded - V 0.0.9 with status: Final draft for approval
2022-08-23 birnbaum Draft contributed - V 0.0.8 contributed for Decision in ESI(22)078011 as Final draft for approval
2022-08-23 birnbaum A new draft is uploaded - V 0.0.8 with status: Final draft for approval
2022-07-27 compans Final draft for approval proposal in contribution ESI(22)000073 was Noted by ESI (see RC ESI(22)DEC264)
2022-06-14 birnbaum Final draft for approval proposal in contribution ESI(22)000072 was Withdrawn by ESI
2022-06-13 popenn Draft contributed - V 0.0.7 contributed for Decision in ESI(22)000073 as Final draft for approval
2022-06-13 birnbaum Draft contributed - V 0.0.7 contributed for Decision in ESI(22)000072 as Final draft for approval
2022-06-13 birnbaum A new draft is uploaded - V 0.0.7 with status: Final draft for approval
2022-04-20 birnbaum Draft contributed - V 0.0.6 contributed for Decision in ESI(22)077007 as Final draft for approval
2022-04-20 birnbaum A new draft is uploaded - V 0.0.6 with status: Final draft for approval
2021-09-30 birnbaum A new draft is uploaded - V 0.0.4 with status: Final draft for approval
2021-09-30 birnbaum Draft contributed - V 0.0.3 contributed for Decision in ESI(21)075011 as Early draft
2021-04-19 birnbaum Draft contributed - V 0.0.3 contributed for Discussion in ESI(21)073008 as Early draft
2021-04-19 birnbaum A new draft is uploaded - V 0.0.3 with status: Early draft
2021-03-18 birnbaum Draft contributed - V 0.0.2 contributed for Discussion in ESI(21)000040 as Early draft
2021-03-18 birnbaum A new draft is uploaded - V 0.0.2 with status: Early draft
2020-10-28 birnbaum Draft contributed - V 0.0.1 contributed for Discussion in ESI(20)071_027 as Early draft
2020-05-12 mkinsih Draft contributed - V 0.0.1 contributed for Decision in ESI(20)070_023 as Early draft
2020-05-12 mkinsih Early draft proposal in contribution ESI(20)070_020r1 was Withdrawn by ESI
2020-05-11 birnbaum Draft contributed - V 0.0.1 contributed for Discussion in ESI(20)070_020r1 as Early draft
2020-05-11 birnbaum Early draft proposal in contribution ESI(20)070_020 was Revised by ESI
2020-05-11 birnbaum A new draft is uploaded - V 0.0.1 with status: Early draft
2020-05-11 birnbaum Draft contributed - V 0.0.0 contributed for Discussion in ESI(20)070_020 as Early draft
2019-05-06 birnbaum Draft contributed - V 0.0.0 contributed for Discussion in ESI(19)000116 as Early draft
2019-05-03 birnbaum A new draft is uploaded - V 0.0.0 with status: Early draft - with comment: skeleton - v0.0.0a
2019-03-29 COMPANS TB adoption of WI ESI, see contribution ESI(19)66_031r1
2019-03-27 COMPANS WI proposed to TB ESI, see contribution ESI(19)66_031r1
2019-03-27 BIRNBAUM WI proposed to TB ESI, see contribution ESI(19)66_031
 

Specific aspects
  User/consumer aspects
Displaying Item 21 of 34...

ETSI Home Page Any comments or problems with this application? Please let us know...