2024-03-28 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'REN/ERM-TG28-562' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  REN/ERM-TG28-562 EN 300 440-1   ERM TG28
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Early draft (2020-06-25) 0.0.5 Draft   View Standstill Information 2019-01-30
  Rapporteur Technical Officer Harmonised Standard
  Jan Willems Igor Minaev Yes
 
Title Short Range Devices (SRD), Radiocommunication equipment in the frequency range 1 GHz to 40 GHz; Harmonised Standard for access to radio spectrum
Radiocommunication equipment in 1-40 GHz 
Scope and Field
of Application
EN for SRD radio communication devices between 1 GHz to 40 GHz in accordance with the essential requirements of the Radio Equipment Directive 2014/53/EU Article 3(2).
The work includes necessary updates/corrections based on EC assessment (on EN 300 440 V2.2.1), and experience made on the conformance test (under article 3.2 of the RED).
 
Supporting
Organizations
BMWi, ROBERT BOSCH GmbH, Sony Europe Limited, ISAD e.V, ZES BVBA 

 

Keywords Projects Clusters Frequencies Mandates Directives
  RADIO
SRD
TESTING
  Better Living with ICT
Home & Office
Transportation
Non-specific SRDs (5,725 GHz to 5,875 GHz)
Non-specific SRDs (2,4 GHz to 2,4835 GHz)
Non-specific SRDs (24 GHz to 24,25 GHz)
M/536
2014/53/EU
Official Journal
     
Remarks
2020-06-25   A new draft is uploaded - V 0.0.5 with status: Early draft - with comment: Update after drafting session.
2019-11-18   A new draft is uploaded - V 0.0.4 with status: Early draft - with comment: outcome after drafting session 5
2019-10-11   A new draft is uploaded - V 0.0.3 with status: Early draft - with comment: Early draft after drafting session 4.
2019-08-23   A new draft is uploaded - V 0.0.2 with status: Early draft - with comment: draft updated after drafting session _3
2019-07-05   A new draft is uploaded - V 0.0.1 with status: Early draft - with comment: First draft after drafting meeting.
2019-02-19 BUTSCHEI TB adoption of WI ERM, see contribution ERM(19)067034
2019-02-01 BUTSCHEI WI Proposal withdrawn ERM, see contribution ERM(18)66b045
2019-01-30 MINAEV WI proposed to WG ERM TG28, see contribution ERM(19)067034
2019-01-30 MINAEV WI proposed to WG ERM TG28, see contribution ERM(18)66b045
2019-01-30 MINAEV WI accepted by WG ERM TG28, see contribution ERMTG28(19)052027r1
2019-01-30 MINAEV WI proposed to WG ERM TG28, see contribution ERMTG28(19)052027r1
2019-01-30 MAHLER WI proposed to WG ERM TG28, see contribution ERMTG28(19)052027
 

Specific aspects
  User/consumer aspects
Displaying Item 385 of 418...

ETSI Home Page Any comments or problems with this application? Please let us know...