2024-04-16 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DGR/NGP-0015' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DGR/NGP-0015 (PDF Format) Download standrd ref:
DGR/NGP-0015 (Word Format)
  DGR/NGP-0015 GR NGP 015   NGP
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2019-11-18) 1.1.1 2019-11-18 View Standstill Information 2018-09-07
  Rapporteur Technical Officer Harmonised Standard
  Lin Han Emmanuelle Chaulot-Talmon No
 
Title Next Generation Protocol (NGP); Recommendation for Network Layer Multi-Path Support
 
Scope and Field
of Application
This work item will present the gap analysis for new internet architectures, focusing on the solution to support multi-path for 5G and beyond: 1) access network may or may not have multiple interfaces; 2) content provider network is directly connected to access network or peering through an IXP or a transit network 3) multi-path are available between access networks of end-users. The solution may include new control and data plane protocol proposals. 
Supporting
Organizations
VODAFONE Group Plc, BSI, Huawei Tech.(UK) Co., Ltd, BT plc 

 

Keywords Projects Clusters Frequencies Mandates Directives
  INTERNET
IP
PATH
  Wireless Systems
     
Official Journal
     
Remarks
2019-10-15 chaulottalmo TB approval proposal in contribution NGP(19)000036 was Accepted by NGP (see RC NGP(19)DEC023)
2019-10-07 chaulottalmo Draft contributed - V 0.0.6 contributed for Decision in NGP(19)000036 as Final draft for approval
2019-10-01 hanli A new draft is uploaded - V 0.0.6 with status: Final draft for approval - with comment: This is the final draft for public consensus
2019-04-23 hanli Draft contributed - V 0.0.1 contributed for Discussion in NGP(19)000012 as Early draft
2019-04-23 hanli Early draft proposal in contribution NGP(19)000006r1 was Withdrawn by NGP
2019-04-23 hanli Draft contributed - V 0.0.1 contributed for Discussion in NGP(19)000006r1 as Early draft
2019-04-23 hanli Early draft proposal in contribution NGP(19)000006 was Revised by NGP
2019-03-01 hanli Draft contributed - V 0.0.1 contributed for Discussion in NGP(19)000006 as Early draft
2019-03-01 hanli A new draft is uploaded - V 0.0.1 with status: Early draft
2018-09-07 HANLI TB adoption of WI NGP, see contribution NGP(18)000109r1
2018-09-07 HANLI WI proposed to TB NGP, see contribution NGP(18)000109r1
2018-09-07 HANLI WI proposed to TB NGP, see contribution NGP(18)000109
 

Specific aspects
  User/consumer aspects
  Displaying Item 3 of 3...
 

ETSI Home Page Any comments or problems with this application? Please let us know...