2024-03-28 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'REN/ERM-TGUWB-150-1-1' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  REN/ERM-TGUWB-150-1-1 EN 302 065-1-1   ERM TGUWB
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Early draft (2023-01-25) 0.0.3 Draft   View Standstill Information 2018-06-21
  Rapporteur Technical Officer Harmonised Standard
  Dries Neirynck Guillermo Vietti Yes
 
Title Short Range Devices (SRD) using Ultra Wide Band technology (UWB); Harmonised Standard for access to radio spectrum; Part 1: Generic UWB devices; Sub-part 1: Communication devices within 3,1 GHz to 4,8 GHz using LDC mitigation or within the 6 to 8.5 GHz.
Generic UWB Communication 
Scope and Field
of Application
This work item to amend the former version EN 302 065-1 V2.1.1 is targeted to address the request of the EU Desk Officer. This includes a detailed description of the wanted performance criterion, RX-requirements and fixed limits for all requirements based on a clear test procedure.
A first collection of open points which shall be considered (in addition) are uploaded as: TGUWB[17]040001 and TGUWB(17)040007
Therefore, this EN will focus on transceivers, transmitters or receivers utilising ultra-wideband (UWB) technologies for communication purposes. These devices operate in the 3,1 to 4,8 GHz range with the LDC mitigation technique or in 6 to 8.5 GHz range (see ECC/DEC/(06)04, Decision 2007/131/EC and its amendments).

 
Supporting
Organizations
ROBERT BOSCH GmbH, ZES BVBA, DecaWave Ltd, Novelda AS 

 

Keywords Projects Clusters Frequencies Mandates Directives
  Harmonised standard
SRD
UWB
  Better Living with ICT
Connecting Things
Home & Office
Wireless Systems
UWB (6 GHz to 9 GHz)
UWB (3,1 GHz to 4,8 GHz)
M/536
2014/53/EU
Official Journal
     
Remarks
2023-02-10 mahler Early draft proposal in contribution ERMTGUWB(23)000001 was Noted by ERM TGUWB
2023-02-06 neirynckdri1 Draft contributed - V 0.0.3 contributed for Information in ERMTGUWB(23)000001 as Early draft
2023-01-25 neirynckdri1 A new draft is uploaded - V 0.0.3 with status: Early draft
2022-02-16 mahler Early draft proposal in contribution ERMTGUWB(22)060024 was Noted by ERM TGUWB
2022-02-07 neirynckdri1 Draft contributed - V 0.0.2 contributed for Discussion in ERMTGUWB(22)060024 as Early draft
2022-02-07   A new draft is uploaded - V 0.0.2 with status: Early draft - with comment: TX and RX conformance requirements based on 065-3-1
2021-11-19 mahler Early draft proposal in contribution ERMTGUWB(21)059029 was Noted by ERM TGUWB
2021-11-08 neirynckdri1 Draft contributed - V 0.0.1 contributed for Discussion in ERMTGUWB(21)059029 as Early draft
2021-11-08   A new draft is uploaded - V 0.0.1 with status: Early draft - with comment: First skeleton
2018-09-03 BUTSCHEI TB adoption of WI ERM, see contribution ERM(18)65b025 in RC ERM(18)DEC613
2018-07-27 MAHLER WI proposed to WG ERM TGUWB, see contribution ERM(18)65b025
2018-06-21 MAHLER WI accepted by WG ERM TGUWB, see contribution ERMTGUWB(18)045019
2018-06-21 MAHLER WI proposed to WG ERM TGUWB, see contribution ERMTGUWB(18)045019
 
Displaying Item 194 of 411...

ETSI Home Page Any comments or problems with this application? Please let us know...