2024-03-28 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DEN/ERM-TGUWB-142' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DEN/ERM-TGUWB-142 (PDF Format) Download standrd ref:
DEN/ERM-TGUWB-142 (Word Format)
  DEN/ERM-TGUWB-142 EN 302 065-5   ERM TGUWB
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2017-09-01) 1.1.1 2017-09-01 View Standstill Information 2016-05-11
  Rapporteur Technical Officer Harmonised Standard
  Dries Neirynck Igor Minaev Yes View Transposition Data
 
Title Short Range Devices (SRD) using Ultra Wide Band technology (UWB); Harmonised Standard covering the essential requirements of article 3.2 of Directive 2014/53/EU; Part 5: Devices using UWB technology onboard aircraft
UWB onboard aircraft 
Scope and Field
of Application
Creation of necessary new part to cover the essential requirements of article 3.2 of the RE-D for UWB devices regulated under ECC/DEC(12)03 and 2014/702/EU.  
Supporting
Organizations
ROBERT BOSCH GmbH, Ubisense Ltd, Honeywell Enraf BV, ZES BVBA, DecaWave Ltd 

 

Keywords Projects Clusters Frequencies Mandates Directives
  Harmonised standard
RADIO
SRD
TESTING
UWB
  Better Living with ICT
Connecting Things
Home & Office
Wireless Systems
UWB (6 GHz to 8,5 GHz)
M/536
2014/53/EU
Official Journal
     
Remarks
2016-10-27 butscheidt Final draft for approval proposal in contribution ERM(16)060037 was Accepted by ERM
2016-10-06 mahler Draft contributed - V 0.0.6 contributed for Decision in ERM(16)060037 as Final draft for approval
2016-10-06 mahler Draft contributed - V 0.0.6 contributed for Decision in ERMTGUWB(16)034016r2 as Final draft for approval
2016-10-06 mahler Final draft for approval proposal in contribution ERMTGUWB(16)034016r1 was Revised by ERM TGUWB
2016-10-06 mahler A new draft is uploaded - V 0.0.6 with status: Final draft for approval
2016-10-06 neirynck Draft contributed - V 0.0.5 contributed for Decision in ERMTGUWB(16)034016r1 as Final draft for approval
2016-10-06 neirynck Early draft proposal in contribution ERMTGUWB(16)034016 was Revised by ERM TGUWB
2016-10-06 neirynck A new draft is uploaded - V 0.0.5 with status: Final draft for approval
2016-10-06 mahler Early draft proposal in contribution ERMTGUWB(16)034004 was Noted by ERM TGUWB
2016-10-06 neirynck Draft contributed - V 0.0.4 contributed for Discussion in ERMTGUWB(16)034016 as Early draft
2016-10-06 neirynck A new draft is uploaded - V 0.0.4 with status: Early draft
2016-10-04 neirynck Draft contributed - V 0.0.3 contributed for Discussion in ERMTGUWB(16)034004 as Early draft
2016-10-04 neirynck A new draft is uploaded - V 0.0.3 with status: Early draft - with comment: Started adding porthole evaluation procedure; Open questions on RED mandate and interpretation mitigation requirements
2016-09-08 butscheidt Early draft proposal in contribution ERMTGUWB(16)033021 was Noted by ERM TGUWB
2016-09-08 butscheidt Early draft proposal in contribution ERMTGUWB(16)033002 was Noted by ERM TGUWB
2016-07-27 neirynck Draft contributed - V 0.0.2 contributed for Discussion in ERMTGUWB(16)033021 as Early draft
2016-07-27 neirynck A new draft is uploaded - V 0.0.2 with status: Early draft
2016-06-27 neirynck Draft contributed - V 0.0.1 contributed for Discussion in ERMTGUWB(16)033002 as Early draft
2016-06-27 neirynck A new draft is uploaded - V 0.0.1 with status: Early draft
2016-06-09 BUTSCHEI TB adoption of WI ERM, see contribution ERM(16)059047
2016-05-11 MAHLER WI proposed to TB ERM, see contribution ERM(16)059047
2016-05-11 MAHLER WI accepted by WG ERM TGUWB, see contribution ERMTGUWB(16)032011
2016-05-11 MAHLER WI proposed to WG ERM TGUWB, see contribution ERMTGUWB(16)032011
 

Specific aspects
  User/consumer aspects
Displaying Item 163 of 377...

ETSI Home Page Any comments or problems with this application? Please let us know...