2024-04-25 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DTS/INT-00135-3' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DTS/INT-00135-3 (PDF Format) Download standrd ref:
DTS/INT-00135-3 (Word Format) Download standrd ref:
DTS/INT-00135-3 (Zip Format)
  DTS/INT-00135-3 TS 103 497-3 519 INT
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2017-07-20) 1.1.1 2017-07-20 View Standstill Information 2016-04-15
  Rapporteur Technical Officer Harmonised Standard
  Peter Schmitting Helene Schmidt No
 
Title Core Network and Interoperability Testing (INT); S1AP Conformance Testing for the S1-MME interface; (3GPPTM Release 13); Part 3: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) pro forma specification
S1AP Conformance Testing for the S1-MME interface 
Scope and Field
of Application
Phase 1 Conformance Test Specifications for the S1AP and NAS protocols over the S1-MME reference point 
Supporting
Organizations
Telekom Austria AG, TELECOM ITALIA S.p.A., Deutsche Telekom AG, Sintesio, Foundation 

 

Keywords Projects Clusters Frequencies Mandates Directives
  ATS
CONFORMANCE
PIXIT
S1AP
3GPP-Release-13
Interoperability
     
Official Journal
     
Remarks
2017-06-16 schmidth Final draft for approval proposal in contribution INT(17)037010 was Accepted by INT
2017-06-01 schmitting Draft contributed - V 0.0.8 contributed for Decision in INT(17)037010 as Final draft for approval
2017-06-01 schmitting A new draft is uploaded - V 0.0.8 with status: Final draft for approval
2017-04-04 schmidth Early draft proposal in contribution INT(17)036014r1 was Noted by INT
2017-03-21 schmitting Draft contributed - V 0.0.4 contributed for Information in INT(17)036014r1 as Early draft
2017-03-21 schmitting Early draft proposal in contribution INT(17)036014 was Revised by INT
2017-03-21 schmitting A new draft is uploaded - V 0.0.4 with status: Early draft
2017-03-20 schmitting Draft contributed - V 0.0.3 contributed for Information in INT(17)036014 as Early draft
2017-03-20 schmitting A new draft is uploaded - V 0.0.3 with status: Early draft
2016-10-11 schmitting A new draft is uploaded - V 0.0.1 with status: Early draft
2016-04-26 SCHMIDTH TB adoption of WI INT, see contribution INT(16)000004 in RC INT(16)DEC041
2016-04-15 SCHMIDTH WI proposed to TB INT, see contribution INT(16)000004
 
Displaying Item 10 of 13...

ETSI Home Page Any comments or problems with this application? Please let us know...