2024-04-24 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DGS/NFV-EVE007' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DGS/NFV-EVE007 (PDF Format) Download standrd ref:
DGS/NFV-EVE007 (Word Format)
  DGS/NFV-EVE007 GS NFV-EVE 007   NFV EVE
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2017-03-23) 3.1.1 2017-03-23 View Standstill Information 2016-01-20
  Rapporteur Technical Officer Harmonised Standard
  Percy Tarapore Laurent Vreck No
 
Title Network Functions Virtualisation (NFV) Release 3; NFV Evolution and Ecosystem; Hardware Interoperability Requirements Specification
NFVI Hw rqmts spec 
Scope and Field
of Application
This Work Item proposes to develop a set of Normative interoperability requirements for the NFV hardware ecosystem and telecommunications physical environment to support NFV deployment. It builds on the work originated in EVE003.

The Work Item scope encompasses the following:
-Specification of requirements to enable interoperability of equipment in the telecommunications environment to support NFV deployment. The focus includes the following areas:
-Operations
-Environmental
-Mechanical
-Cabling
-Maintenance.
•Specification of requirements for the support of lawful intercept and/or critical national infrastructures.
•Investigate baseline reliability requirements for NFVI Node
•Collaborate with other existing industry fora or SDOs (e.g., Open Compute Project – Telco Project) to ensure NFV hardware interoperability requirements are fulfilled.
 
Supporting
Organizations
SWISSCOM, Nokia Networks, NEC EUROPE LTD, BT Group Plc, CableLabs, Intel Corporation (UK) Ltd, AT&T GNS Belgium SPRL, Huawei Tech.(UK) Co., Ltd 

 

Keywords Projects Clusters Frequencies Mandates Directives
  INTEROPERABILITY
NFV
NFVI
Requirements
NFV_Release3
Networks
     
Official Journal
     
Remarks
2017-03-31 vreck WI Revision. 1 WI created with Ref: RGS/NFV-EVE007ed312. Comments copied = Yes, Schedule copied = Default
2017-02-27 vreck A new draft is uploaded - V 0.1.2 with status: Final draft for approval - with comment: As per NFV_17 plenary decision: Implemented CR in NFV(17)000030 on top of the APPROVED v0.1.1 in NFV(17)000019r1 + reverted title to Work programme value.
2017-02-03 taraporep Status updated - V 0.1.1 with status: Final draft for approval
2017-02-03 taraporep Status updated - V 0.1.1 with status: Early draft
2017-02-03 taraporep A new draft is uploaded - V 0.1.1 with status: Early draft
2017-02-02 maisonneuve1 Final draft for approval proposal in contribution NFVEVE(17)000017 was Accepted by NFV EVE
2017-01-27 taraporep Draft contributed - V 0.1.0 contributed for Decision in NFVEVE(17)000017 as Final draft for approval
2017-01-19 taraporep Status updated - V 0.1.0 with status: Final draft for approval
2017-01-19 taraporep A new draft is uploaded - V 0.1.0 with status: Early draft
2016-12-19 taraporep A new draft is uploaded - V 0.0.4 with status: Stable draft
2016-12-19 clarkel Draft file Deleted - Version 0.0.4 in file NFV-EVE007v004.doc has been permanently deleted
2016-12-08 barzycki A new draft is uploaded - V 0.0.4 with status: Final draft for approval - with comment: joe.barzycki@dell.com
2016-09-22 taraporep A new draft is uploaded - V 0.0.3 with status: Early draft
2016-07-07 taraporep A new draft is uploaded - V 0.0.2 with status: Early draft
2016-04-11 nguyenphu A new draft is uploaded - V 0.0.1 with status: Early draft
2016-02-23 TARAPORE TB adoption of WI NFV, see contribution NFV(16)000041r2
2016-02-18 TARAPORE WI proposed to TB NFV, see contribution NFV(16)000041r2
2016-02-02 NGUYENPH WI proposed to TB NFV, see contribution NFV(16)000041r1
2016-01-20 NGUYENPH WI proposed to TB NFV, see contribution NFV(16)000041
 
Displaying Item 2 of 53...

ETSI Home Page Any comments or problems with this application? Please let us know...