Work Item Has Been STOPPED

Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  DEN/ERM-EMC-348-1 EN 303 446-1   ERM WGEMC
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Suspend work (2019-01-23) 0.1.18 2017-03-17 View Standstill Information 2016-01-19
  Rapporteur Technical Officer Harmonised Standard
  Dirk Eyfrig Antoine Mouquet Yes
 
Title ElectroMagnetic Compatibility (EMC) standard for combined and/or integrated radio and non-radio equipment; Part 1: Requirements for equipment intended to be used in residential, commercial and light industry locations;
Specific conditions for equipment in residential locations 
Scope and Field
of Application
The standard sets requirements for combined radio and non-radio equipment in the domestic environment in respect of ElectroMagnetic Compatibility (EMC) u

The standard, together with
•ETSI EN 301 489-1;
•plus the relevant parts of the ETSI EN 301 489-series for the specific radio technologies deployed;
•plus the relevant CENELEC EMC product standard(s)
specifies the applicable test conditions, performance assessment and performance criteria for radio equipment, including any associated ancillary equipment.
Technical specifications related to the antenna port of the radio equipment are not included in the standard. Such technical specifications are found in the relevant product standards for the effective use of the radio spectrum.
In case of differences (for instance concerning special conditions, definitions, abbreviations) between this standard and ETSI EN 301 489-1, the provisions of this standard take precedence.
The environmental classification and the emission and immunity requirements used in this standard are as stated in ETSI EN 301 489-1, except for any special conditions included in this standard.
The content and conclusions of the newly developed EG 203 367 will be taken into account during the development of this standard. 
Supporting
Organizations
BMWi, Ofcom (U.K.), ROBERT BOSCH GmbH, PTS, Samsung R&D Institute UK, Philips International B.V., Great Circle Design, PCS, SICK AG 

 

Keywords Projects Clusters Frequencies Mandates Directives
  EMC
EMISSION
IMMUNITY
  Networks
Wireless Systems
  M/536
2014/53/EU
Official Journal
     
Remarks
2018-06-05 butscheidt Draft Review after PE proposal in contribution ERM(18)065026 was Accepted by ERM
2018-05-09 funkb Draft contributed - V 0.1.18 contributed for Discussion in ERM(18)002002r1 as Draft Review after PE
2018-05-09 funkb Draft Review after PE proposal in contribution ERM(18)002002 was Revised by ERM
2018-05-09 funkb Draft contributed - V 0.1.18 contributed for Decision in ERM(18)065026 as Draft Review after PE
2018-05-09 funkb A new draft is uploaded - V 0.1.18 with status: Draft Review after PE - with comment: Final after 2nd res meeting
2018-05-07 funkb Draft contributed - V 0.1.17 contributed for Discussion in ERM(18)002002 as Draft Review after PE
2018-05-07 funkb A new draft is uploaded - V 0.1.17 with status: Draft Review after PE - with comment: This is a SUGGESTION to resolve the outstanding comments from the European Commission.
2017-07-05 funkb Draft contributed - V 0.1.16 contributed for Decision in ERMEMC(17)052018 as Draft Review after PE
2017-07-05 funkb A new draft is uploaded - V 0.1.16 with status: Draft Review after PE
2017-07-05 funkb TB approval proposal in contribution ERMEMC(17)000014 was Withdrawn by ERM WGEMC
2017-07-05 funkb Draft contributed - V 0.1.15 contributed for Information in ERMEMC(17)000014 as TB approval
2017-02-21 butscheidt Final draft for approval proposal in contribution ERM(17)061031r4 was Accepted by ERM
2017-02-21 minaev Draft contributed - V 0.1.15 contributed for Decision in ERM(17)061031r4 as Final draft for approval
2017-02-21 minaev Final draft for approval proposal in contribution ERM(17)061031r3 was Revised by ERM
2017-02-21 minaev A new draft is uploaded - V 0.1.15 with status: Final draft for approval
2017-02-21 minaev Draft contributed - V 0.0.15 contributed for Decision in ERM(17)061031r3 as Final draft for approval
2017-02-21 minaev Working Draft proposal in contribution ERM(17)061031r2 was Revised by ERM
2017-02-21 minaev A new draft is uploaded - V 0.0.15 with status: Final draft for approval
2017-02-21 minaev Draft contributed - V 0.0.12 contributed for Decision in ERM(17)061031r2 as Working Draft
2016-10-26 butscheidt Final draft for approval proposal in contribution ERM(16)060073r1 was Accepted by ERM
2016-10-26 funkb Draft contributed - V 0.0.12 contributed for Decision in ERM(16)060073r1 as Final draft for approval
2016-10-26 funkb A new draft is uploaded - V 0.0.12 with status: Final draft for approval - with comment: editorial update of version 0.0.11
2016-10-25 butscheidt Final draft for approval proposal in contribution ERM(16)060073 was Noted by ERM
2016-10-13 butscheidt Status updated - V 0.0.11 with status: Final draft for approval
2016-10-12 funkb Draft contributed - V 0.0.11 contributed for Discussion in ERM(16)060073 as Stable draft
2016-10-12 funkb Draft contributed - V 0.0.11 contributed for Discussion in ERMEMC(16)050015r3 as Stable draft
2016-10-12 funkb A new draft is uploaded - V 0.0.11 with status: Stable draft - with comment: Editorial cleanup still needs to be done on the references, the abbriviations and the table in Annex A. Otherwise the document is final for approval.
2016-10-12 funkb Stable draft proposal in contribution ERMEMC(16)050015r2 was Revised by ERM WGEMC
2016-10-11 funkb Draft contributed - V 0.0.10 contributed for Discussion in ERMEMC(16)050015r2 as Stable draft
2016-10-11 funkb Stable draft proposal in contribution ERMEMC(16)050015r1 was Revised by ERM WGEMC
2016-10-11 funkb A new draft is uploaded - V 0.0.10 with status: Stable draft - with comment: Clean version including the proposal for a new informative annex.
2016-10-11 funkb Status updated - V 0.0.9 with status: Stable draft
2016-10-11 funkb Draft contributed - V 0.0.9 contributed for Discussion in ERMEMC(16)050015r1 as Early draft
2016-10-11 funkb A new draft is uploaded - V 0.0.9 with status: Early draft - with comment: Version 16hrs 11th of October 2016
2016-10-11 funkb Early draft proposal in contribution ERMEMC(16)050015 was Revised by ERM WGEMC
2016-10-11 funkb Draft contributed - V 0.0.8 contributed for Discussion in ERMEMC(16)050015 as Early draft
2016-10-11 funkb A new draft is uploaded - V 0.0.8 with status: Early draft - with comment: Working document as discussed during the ERM WG EMC meeting in Prague
2016-04-12 funkb Draft contributed - V 0.0.1 contributed for Discussion in ERMEMC(16)048003r2 as Early draft
2016-04-12 funkb Early draft proposal in contribution ERMEMC(16)048003r1 was Revised by ERM WGEMC
2016-04-11 funkb Draft contributed - V 0.0.1 contributed for Discussion in ERMEMC(16)048003r1 as Early draft
2016-04-11 funkb Early draft proposal in contribution ERMEMC(16)048003 was Revised by ERM WGEMC
2016-04-08 marshall Draft contributed - V 0.0.1 contributed for Discussion in ERMEMC(16)048003 as Early draft
2016-04-08 marshall A new draft is uploaded - V 0.0.1 with status: Early draft - with comment: First draft for discussion at WG_EMC_48
2016-02-25 BUTSCHEI TB adoption of WI ERM, see contribution ERM(16)000001r4
2016-02-25 BUTSCHEI WI proposed to TB ERM, see contribution ERM(16)000001r4
2016-02-23 FUNKB WI proposed to TB ERM, see contribution ERM(16)000001r3
2016-02-23 FUNKB WI proposed to TB ERM, see contribution ERM(16)000001r2