2024-03-28 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RTS/INT-00131-1' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
RTS/INT-00131-1 (PDF Format) Download standrd ref:
RTS/INT-00131-1 (Word Format)
  RTS/INT-00131-1 TS 103 374-1 512 INT
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2017-01-19) 1.2.1 2017-01-19 View Standstill Information 2015-10-13
  Rapporteur Technical Officer Harmonised Standard
  Peter Schmitting Helene Schmidt No
 
Title Core Network and Interoperability Testing (INT); Diameter Conformance testing for Rf/Ro interface; (3GPPTM Release 10); Part 1: Protocol Implementation Conformance Statement (PICS)
Diameter Conformance testing for Rf/Ro interface 
Scope and Field
of Application
The Rf interface that enables transfer of offline charging information is located between the Call Session Control Functions (CSCF) or Application Servers (AS) and the Charging Data Function (CDF). The Ro interface that enables transfer of online charging information is located between the Application Server (AS), IMS Gateway Function (IMS-GW) or Media Gateway Control Function (MGCF) and the Charging Data Function (CDF). 
Supporting
Organizations
Telekom Austria AG, TELECOM ITALIA S.p.A., Deutsche Telekom AG, Iskratel Ltd. 

 

Keywords Projects Clusters Frequencies Mandates Directives
  CONFORMANCE
Diameter
PICS
PROTOCOL
3GPP-Release-10
Interoperability
     
Official Journal
     
Remarks
2016-12-19 schmidth Final draft for approval proposal in contribution INT(16)035006 was Accepted by INT
2016-12-07 schmitting Draft contributed - V 2.0.3 contributed for Decision in INT(16)035006 as Final draft for approval
2016-12-07 schmitting A new draft is uploaded - V 2.0.3 with status: Final draft for approval
2016-08-24 schmitting Draft contributed - V 2.0.2 contributed for Discussion in INT(16)034004 as Stable draft
2016-08-24 schmitting A new draft is uploaded - V 2.0.2 with status: Stable draft
2016-07-01 schmidth Early draft proposal in contribution INT(16)033020 was Noted by INT
2016-06-23 schmitting Draft contributed - V 2.0.1 contributed for Discussion in INT(16)033020 as Early draft
2016-06-23 schmitting A new draft is uploaded - V 2.0.1 with status: Early draft
2016-06-23 garciay A new draft is uploaded - V 1.1.2 with status: Early draft - with comment: Diameter Conformance testing for Rf_Ro interface; (3GPP Release 10); Part 1: Protocol Implementation Conformance Statement (PICS)
 
Displaying Item 10 of 42...

ETSI Home Page Any comments or problems with this application? Please let us know...