2024-03-29 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DES/EE-EEPS19' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DES/EE-EEPS19 (PDF Format) Download standrd ref:
DES/EE-EEPS19 (Word Format)
  DES/EE-EEPS19 ES 203 539   EE EEPS
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2019-06-05) 1.1.1 2019-06-05 View Standstill Information 2015-06-04
  Rapporteur Technical Officer Harmonised Standard
  Bin Zhu Marcello Pagnozzi No
 
Title Environmental Engineering (EE); Measurement method for energy efficiency of Network Functions Virtualisation (NFV) in laboratory environment
Measurement method for Energy efficiency of NFV (laboratory) (TA-ITU-L.1361) 
Scope and Field
of Application
to establish a new energy efficiency measurement methods and metrics to support NFV scenarios, such as IMS and EPC, to define measurement methods for: 1) VNF, 2)Server, 3) NFVI(NFV Infrastrucutre) including HW and hypervisor. A similar work item will be also proposed in ITU-T SG5 for having common deliverables. NOTE: the work will look on Network Function Virtualization(NFV) transformation that will dramatically change telecom network architecture with decoupled software and hardware. Actual available Energy efficient measurement methods of traditional all-in-one telecom equipments will be not directly suitable for NFV components (e.g. Virtualized Network Functions (VNF), hypervisor hardware, Management and Orchestration) from different vendors. 
Supporting
Organizations
ORANGE, TELECOM ITALIA S.p.A., CNIT, Huawei Tech.(UK) Co., Ltd, Alcatel-Lucent 

 

Keywords Projects Clusters Frequencies Mandates Directives
  Energy Efficiency
NFV
SDN
  Better Living with ICT
  M/462
 
Official Journal
     
Remarks
2018-09-25 gemma WG approval proposal in contribution EE(18)000019 was Withdrawn by EE
2018-09-25 gemma Draft contributed - V 0.0.7 contributed for Decision in EE(18)000019 as WG approval
2018-09-25 gemma Draft contributed - V 0.0.7 contributed for Decision in EE(18)000018 as Final draft for approval
2018-06-01 gemma Draft contributed - V 0.0.7 contributed for Discussion in EEPS(18)053024 as Final draft for approval
2018-05-31 gemma Draft contributed - V 0.0.7 contributed for Discussion in EEPS(18)000025 as Final draft for approval
2018-05-31 gemma A new draft is uploaded - V 0.0.7 with status: Final draft for approval
2018-05-29 gemma Draft contributed - V 0.0.6 contributed for Discussion in EEPS(18)531003 as Final draft for approval
2018-05-29 gemma A new draft is uploaded - V 0.0.6 with status: Final draft for approval
2017-11-23 gemma Draft contributed - V 0.0.5 contributed for Discussion in EEPS(17)052014 as Stable draft
2017-05-31 gemma Draft contributed - V 0.0.5 contributed for Discussion in EEPS(17)051019 as Stable draft
2017-05-31 gemma A new draft is uploaded - V 0.0.5 with status: Stable draft
2017-05-16 gemma Draft contributed - V 0.0.4 contributed for Discussion in EEPS(17)051002 as Early draft
2017-05-16 gemma A new draft is uploaded - V 0.0.4 with status: Early draft
2016-09-07 binzh Draft contributed - V 0.0.3 contributed for Information in EEPS(16)050021 as Early draft
2016-09-07 binzh A new draft is uploaded - V 0.0.3 with status: Early draft
2016-05-23 gemma Draft contributed - V 0.0.2 contributed for Discussion in EEPS(16)049009 as Early draft
2016-05-23 gemma A new draft is uploaded - V 0.0.2 with status: Early draft
2016-01-30 binzh Draft contributed - V 0.0.1 contributed for Discussion in EEPS(16)000009 as Early draft
2016-01-30 binzh A new draft is uploaded - V 0.0.1 with status: Early draft
2015-11-13 BINZH TB adoption of WI EE, see contribution EE(15)048009r3
2015-10-01 GEMMA WI proposed to TB EE, see contribution EE(15)048009
2015-10-01 PAGNOZZI WI accepted by WG EE EEPS, see contribution EEPS(15)047007r2 in RC EEPS(15)DEC014
2015-08-25 PAGNOZZI WI proposed to WG EE EEPS, see contribution EEPS(15)047007r2
2015-06-11 GEMMA WI proposed to WG EE EEPS, see contribution EEPS(15)047007r1
2015-06-04 BINZH WI proposed to WG EE EEPS, see contribution EEPS(15)047007
 
Displaying Item 9 of 14...
 

ETSI Home Page Any comments or problems with this application? Please let us know...