Details of 'REN/ERM-EMC-339' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
REN/ERM-EMC-339 (PDF Format) Download standrd ref:
REN/ERM-EMC-339 (Word Format)
  REN/ERM-EMC-339 EN 301 489-34   ERM WGEMC
  Current Status Draft
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Start of Withdrawal Vote (2024-03-14) 2.1.1 2019-04-09 View Standstill Information 2015-03-24
  Rapporteur Technical Officer Harmonised Standard
  Ian Doig Antoine Mouquet Yes View Transposition Data
 
Title ElectroMagnetic Compatibility (EMC) standard for radio equipment and services; Part 34: Specific conditions for External Power Supply (EPS) for mobile phones; Harmonised Standard covering the essential requirements of article 6 of Directive 2014/30/EU
EMC requirements for mobile phone EPS 
Scope and Field
of Application
Revision to update the references and bring the HS in line with the requirements of the RE-D 
Supporting
Organizations
Ministry of Economic Affairs, PTS, Sony Europe Limited, Apple (UK) Limited, BlackBerry UK Limited 

 

Keywords Projects Clusters Frequencies Mandates Directives
  EMC
Harmonised standard
MOBILE
RADIO
  Networks
Wireless Systems
  M/552
2014/30/EU
Official Journal
     
Remarks
2024-03-13 vantricht DG21-31/ADM/LJR/JJL: EN 61204-3:2000, currently cited under the EMC Directive, covers chargers within its scope and could be used instead of EN 301 489-34. The additional protection requirements in EN 301 489-34 to protect the charger from fields generated
2017-02-22 butscheidt Draft Review after PE proposal in contribution ERM(17)061040r2 was Accepted by ERM
2017-02-22 butscheidt Draft contributed - V 0.0.9 contributed for Decision in ERM(17)061040r2 as Draft Review after PE
2017-02-22 butscheidt Draft Review after PE proposal in contribution ERM(17)061040r1 was Revised by ERM
2017-02-22 marshall Draft contributed - V 0.0.9 contributed for Decision in ERM(17)061040r1 as Draft Review after PE
2017-02-22 marshall Draft Review after PE proposal in contribution ERM(17)061040 was Revised by ERM
2017-02-06 marshall Draft contributed - V 0.0.9 contributed for Decision in ERM(17)061040 as Draft Review after PE
2017-02-01 minaev Draft contributed - V 0.0.9 contributed for Decision in ERMEMC(17)051039r1 as Draft Review after PE
2017-02-01 minaev Draft Review after PE proposal in contribution ERMEMC(17)051039 was Revised by ERM WGEMC
2017-02-01 minaev A new draft is uploaded - V 0.0.9 with status: Draft Review after PE
2017-01-31 minaev Draft contributed - V 0.0.8 contributed for Decision in ERMEMC(17)051039 as Draft Review after PE
2017-01-31 minaev A new draft is uploaded - V 0.0.8 with status: Draft Review after PE
2016-11-08 minaev Draft is awaiting assessemnt of the EC, if it is within the scope of RE-D or not.
2016-10-25 butscheidt Draft Review after PE proposal in contribution ERM(16)060062 was Noted by ERM
2016-10-11 funkb Draft contributed - V 0.0.7 contributed for Discussion in ERM(16)060062 as Draft Review after PE
2016-10-11 funkb Draft contributed - V 0.0.7 contributed for Discussion in ERMEMC(16)050014 as Draft Review after PE
2016-10-11 funkb A new draft is uploaded - V 0.0.7 with status: Draft Review after PE - with comment: Discussed at the ERM WG EMC meeting in Prague.
2016-02-23 butscheidt Final draft for approval proposal in contribution ERM(16)058031r1 was Accepted by ERM
2016-02-01 marshall Draft contributed - V 0.0.6 contributed for Decision in ERM(16)058031r1 as Final draft for approval
2016-02-01 marshall Final draft for approval proposal in contribution ERM(16)058031 was Revised by ERM
2016-02-01 marshall A new draft is uploaded - V 0.0.6 with status: Final draft for approval - with comment: Reinsertion of EN 61000-3-2 and EN61000-3-3
2016-01-22 marshall Draft contributed - V 0.0.5 contributed for Decision in ERM(16)058031 as Final draft for approval
2016-01-15 marshall A new draft is uploaded - V 0.0.5 with status: Final draft for approval - with comment: All edits completed and sent to WG_EMC for consensus approval to proceed to ERM for approval to go to ENAP
2016-01-13 muellerandr Draft contributed - V 0.0.4 contributed for Decision in ERMEMC(16)047020r1 as Final draft for approval
2016-01-13 muellerandr Final draft for approval proposal in contribution ERMEMC(16)047020 was Revised by ERM WGEMC
2016-01-13 muellerandr A new draft is uploaded - V 0.0.4 with status: Final draft for approval - with comment: draft version 0.0.4
2016-01-13 muellerandr Draft contributed - V 0.0.3 contributed for Decision in ERMEMC(16)047020 as Final draft for approval
2016-01-13 muellerandr A new draft is uploaded - V 0.0.3 with status: Final draft for approval - with comment: For final revision and approval during WG EMC_47
2015-07-29 minaev Draft contributed - V 0.0.2 contributed for Decision in ERMEMC(15)046010 as Early draft
2015-07-29 DOIG A new draft is uploaded - V 0.0.2 with status: Early draft
2015-07-29 doig Early draft proposal in contribution ERMEMC(15)046009 was Withdrawn by ERM WGEMC
2015-07-29 doig Draft contributed - V 0.0.1 contributed for Decision in ERMEMC(15)046009 as Early draft
2015-05-11 DOIG A new draft is uploaded - V 0.0.1 with status: Early draft
2015-03-26 BUTSCHEI TB adoption of WI ERM, see contribution ERM(15)055129r1
2015-03-26 BUTSCHEI WI proposed to TB ERM, see contribution ERM(15)055129r1
2015-03-24 MUELLERA WI proposed to TB ERM, see contribution ERM(15)055129
2015-03-24 MUELLERA WI accepted by WG ERM WGEMC, see contribution ERMEMC(15)000015
2015-03-24 MUELLERA WI proposed to WG ERM WGEMC, see contribution ERMEMC(15)000015
 