Remarks |
2017-05-15
|
raffy
|
ETSI EN 303 204 V2.1.1 has been revised and superseded by V 2.1.2. V2.1.1 will never be cited in the OJEU and is being withdrawn in order to avoid confusion for users.
|
2017-04-26
|
minaev
|
ETSI has published this Harmonised Standard that was revised before being cited in the OJEU. As the original versions will never be cited, it is proposed to withdraw these versions in order to avoid confusion for users.
|
2016-09-14
|
forina
|
WI Revision. 1 WI created with Ref: REN/ERM-TG28-536.
Comments copied = No, Schedule copied = Default
|
2015-06-09
|
butscheidt
|
Final draft for approval proposal in contribution ERM(15)056040r1 was Accepted by ERM
|
2015-06-02
|
taylorj
|
Draft contributed - V 0.0.8 contributed for Decision in ERM(15)056040r1 as Final draft for approval
|
2015-06-02
|
taylorj
|
A new draft is uploaded - V 0.0.9 with status: Final draft for approval - with comment: Revised Fianl Draft with updated Transient limits and measurement offsets + shape factor added to Spectrum Analyser requirements.
|
2015-06-01
|
taylorj
|
Final draft for approval proposal in contribution ERM(15)056040 was Revised by ERM
|
2015-05-21
|
minaev
|
Draft contributed - V 0.0.8 contributed for Decision in ERM(15)056040 as Final draft for approval
|
2015-05-21
|
minaev
|
A new draft is uploaded - V 0.0.8 with status: Final draft for approval - with comment: Draft with amendments from Technical officer.
|
2015-05-08
|
taylorj
|
A new draft is uploaded - V 0.0.7 with status: Final draft for approval - with comment: Final draft adding Adjacent channel selectivity requirement and alignments with EN 300 220
|
2015-05-08
|
taylorj
|
A new draft is uploaded - V 0.0.6 with status: Stable draft - with comment: Further edits following drafting group meeting
|
2015-05-03
|
taylorj
|
A new draft is uploaded - V 0.0.5 with status: Stable draft - with comment: Completed new structure, updated Transient Method of Measurement, merged Average Power_ERP as per EN 300 220. References updated together with Bibliography.
Remaining editin...
|
2015-04-30
|
taylorj
|
A new draft is uploaded - V 0.0.4 with status: Early draft - with comment: Close to stable draft version. All headings and cross references updated. Average Power requirement & test merged with ERP as in draft EN 300 220. New Transient test descript...
|
2015-04-27
|
taylorj
|
A new draft is uploaded - V 0.0.3 with status: Early draft - with comment: Editorial changes, including sequence numbered headings and cross references accepted, plus obvious text only editorials.
|
2015-04-15
|
taylorj
|
A new draft is uploaded - V 0.0.2 with status: Early draft - with comment: Working draft after Revision Meeting _2. Annex material text accepted and re-structuring of clauses.
|
2015-04-08
|
taylorj
|
A new draft is uploaded - V 0.0.1 with status: Early draft - with comment: Content of EN 303 204 V1.1.1 parts 1&2 copied into new single part HS skeleton. Heading Numbering adjusted.
|
2015-03-25
|
BUTSCHEI
|
TB adoption of WI ERM, see contribution ERM(15)055100r2
|
2015-03-25
|
BUTSCHEI
|
WI proposed to TB ERM, see contribution ERM(15)055100r2
|
2015-03-22
|
MINAEV
|
WI proposed to TB ERM, see contribution ERM(15)055100r1
|
2015-03-13
|
MINAEV
|
WI proposed to TB ERM, see contribution ERM(15)055100
|
|