2024-03-28 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'REN/ERM-TG30-309' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
REN/ERM-TG30-309 (PDF Format) Download standrd ref:
REN/ERM-TG30-309 (Word Format)
  REN/ERM-TG30-309 EN 302 536   ERM TG30
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2017-10-19) 2.1.1 2017-10-19 View Standstill Information 2015-01-08
  Rapporteur Technical Officer Harmonised Standard
  Phillip Inglis Marcello Pagnozzi Yes View Transposition Data
 
Title Short Range Devices (SRD); Radio equipment operating in the frequency range 315 kHz to 600 kHz for Ultra Low Power Animal Implantable Devices (ULP-AID) and associated peripherals; Harmonised Standard covering the essential requirements of article 3.2 of Directive 2014/53/EU
ULP-AID in 315-600 kHz 
Scope and Field
of Application
Revision of the standard to cover the essential requirements of article 3.2 of the RE-D. 
Supporting
Organizations
Philips International B.V., MEDTRONIC BAKKEN RESEARCH BV, BIOTRONIK SE & Co. KG, Boston Scientific Corp. 

 

Keywords Projects Clusters Frequencies Mandates Directives
  Harmonised standard
inductive
RADIO
REGULATION
  Better Living with ICT
  M/536
2014/53/EU
Official Journal
     
Remarks
2018-12-06 pagnozzi This HSs is not planned to be cited in the EC OJ. New WI has been created to address EC concerns: REN/ERM-TG30-322
2017-06-22 butscheidt Draft Review after PE proposal in contribution ERM(17)062040 was Accepted by ERM
2017-05-31 pagnozzi Draft contributed - V 2.0.3 contributed for Decision in ERM(17)062040 as Draft Review after PE
2017-05-31 pagnozzi Draft Review after PE proposal in contribution ERMTG30(17)055009r1 was Accepted by ERM TG30
2017-05-23 pagnozzi Draft contributed - V 2.0.3 contributed for Decision in ERMTG30(17)055009r1 as Draft Review after PE
2017-05-22 girardgu Draft Review after PE proposal in contribution ERMTG30(17)055009 was Revised by ERM TG30
2017-05-22 girardgu A new draft is uploaded - V 2.0.3 with status: Draft Review after PE
2017-05-22 pagnozzi Draft contributed - V 2.0.2 contributed for Decision in ERMTG30(17)055009 as Draft Review after PE
2017-05-22 pagnozzi A new draft is uploaded - V 2.0.2 with status: Draft Review after PE
2016-10-27 butscheidt TB approval proposal in contribution ERM(16)060109 was Accepted by ERM
2016-10-27 butscheidt TB approval proposal in contribution ERM(16)060048 was Withdrawn by ERM
2016-10-27 butscheidt Draft contributed - V 1.1.6 contributed for Decision in ERM(16)060109 as TB approval
2016-10-07 pagnozzi Final draft for approval proposal in contribution ERM(16)060047 was Accepted by ERM
2016-10-07 pagnozzi Draft contributed - V 1.1.6 contributed for Decision in ERM(16)060047 as Final draft for approval
2016-10-07 pagnozzi Draft contributed - V 1.1.6 contributed for Decision in ERMTG30(16)053008 as Final draft for approval
2016-10-07 pagnozzi A new draft is uploaded - V 1.1.6 with status: Final draft for approval
2016-07-20 inglis Draft contributed - V 1.1.5 contributed for Decision in ERMTG30(16)052007 as Early draft
2016-04-14 pagnozzi Draft contributed - V 1.1.5 contributed for Discussion in ERMTG30(16)051014 as Early draft
2016-04-14 pagnozzi A new draft is uploaded - V 1.1.5 with status: Early draft
2015-02-09 MEZZOUR TB adoption of WI ERM, see contribution ERM(14)54b013 in RC ERM(15)DEC198
2015-01-08 MEZZOUR WI proposed to TB ERM, see contribution ERM(14)54b013
2015-01-08 MINAEV WI accepted by WG ERM TG30, see contribution ERMTG30(15)044005
2015-01-08 MINAEV WI proposed to WG ERM TG30, see contribution ERMTG30(15)044005
 
Displaying Item 126 of 386...

ETSI Home Page Any comments or problems with this application? Please let us know...