2024-03-28 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'REN/ERM-TG30-308' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
REN/ERM-TG30-308 (PDF Format) Download standrd ref:
REN/ERM-TG30-308 (Word Format)
  REN/ERM-TG30-308 EN 302 510   ERM TG30
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Delivery to the EC (2017-01-09) 2.1.1 2017-01-06 View Standstill Information 2015-01-08
  Rapporteur Technical Officer Harmonised Standard
  Phillip Inglis Marcello Pagnozzi Yes View Transposition Data
 
Title Short Range Devices (SRD); Ultra Low Power Active Medical Membrane Implants (ULP-AMI-M) and Peripherals (ULP-AMI-M-P) operating in the frequency range 30 MHz to 37,5 MHz; Harmonised Standard covering the essential requirements of article 3.2 of the Directive 2014/53/EU
ULP-AM in 30 MHz to 37,5 MHz 
Scope and Field
of Application
Revision of the standard to cover the essential requirements of article 3.2 of the RE-D. 
Supporting
Organizations
Philips International B.V., MEDTRONIC BAKKEN RESEARCH BV, BIOTRONIK SE & Co. KG, Boston Scientific Corp. 

 

Keywords Projects Clusters Frequencies Mandates Directives
  Harmonised standard
RADIO
REGULATION
  Better Living with ICT
  M/536
2014/53/EU
Official Journal
     
Remarks
2018-12-06 pagnozzi This HSs is not planned to be cited in the EC OJ. New WI has been created to address EC concerns: REN/ERM-TG30-316
2016-08-03 pagnozzi Draft contributed - V 1.1.5 contributed for Decision in ERM(16)59b022 as WG approval
2016-08-03 pagnozzi Final draft for approval proposal in contribution ERMTG30(16)000007 was Accepted by ERM TG30
2016-08-03 pagnozzi Draft contributed - V 1.1.5 contributed for Decision in ERMTG30(16)000007 as Final draft for approval
2016-08-03 pagnozzi A new draft is uploaded - V 1.1.5 with status: Final draft for approval
2016-06-09 minaev Final draft for approval proposal in contribution ERM(16)059028r1 was Accepted by ERM
2016-06-09 schmidth Draft contributed - V 1.1.3 contributed for Decision in ERM(16)059028r1 as Final draft for approval
2016-06-09 schmidth Final draft for approval proposal in contribution ERM(16)059028 was Revised by ERM
2016-06-09 schmidth A new draft is uploaded - V 1.1.3 with status: Final draft for approval
2016-05-02 mezzour Draft contributed - V 1.1.2 contributed for Decision in ERM(16)059028 as Final draft for approval
2016-05-02 mezzour A new draft is uploaded - V 1.1.2 with status: Final draft for approval - with comment: Please approve this final stable draft for ENAP
2015-02-09 MEZZOUR TB adoption of WI ERM, see contribution ERM(14)54b012 in RC ERM(15)DEC197
2015-01-08 MEZZOUR WI proposed to TB ERM, see contribution ERM(14)54b012
2015-01-08 MINAEV WI accepted by WG ERM TG30, see contribution ERMTG30(15)044004
2015-01-08 MINAEV WI proposed to WG ERM TG30, see contribution ERMTG30(15)044004
 
Displaying Item 140 of 418...

ETSI Home Page Any comments or problems with this application? Please let us know...