2024-04-24 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DES/E2NA-00001-M493-stage2' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DES/E2NA-00001-M493-stage2 (PDF Format) Download standrd ref:
DES/E2NA-00001-M493-stage2 (Word Format)
  DES/E2NA-00001-M493-stage2 ES 203 178   E2NA
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2015-02-25) 1.1.1 2015-02-25   2012-10-15
  Rapporteur Technical Officer Harmonised Standard
  Bernd Henschel Chantal Bonardi No
 
Title Functional architecture to support European requirements on emergency caller location determination and transport
M/493 Functional architecture 
Scope and Field
of Application
Considering TS 102 650 and architectures from other standardisation organisations a single functional architecture to support European requirements on emergency caller location determination and transport needs to be developed in particular for the case where VoIP service provider and one or several network operators - all serving the customer in the establishment of an emergency call - are independent enterprises needing to co-operate to determine the location of the (nomadic) caller. The architecture shall identify all necessary interfaces, which are needed to fulfil the requirements outlined in EC Mandate M/493, and provide a basis for possible protocols to be used on those interfaces. Environmental aspect comments: 1) The establishment of emergency calls and the provision of location information about the caller shall not be hampered by high service or network loads or partial service or network outages. (2) The location information shall be provided to the PSAP in a manner that it is easily associated with the respective incoming voice call. (3) Location related information accurate enough to allow routing of the call must be constrained to those entities that require it in order to deliver the call to the correct PSAP. (4) Accurate location information shall be obtained from at least a trustworthy source. A CPE may not be considered trustworthy. User /Consumer Aspects comments: 1) The location should be determined as fast as possible. (2) Should the location determination fail for any reason, the emergency call is still to be setup without delay. (3) The access to and the provision of location information shall be strictly limited to emergency calls only. (4) The architecture shall not be based on location information provided by an entity controlled by the user. Security Aspects (1) The access to location information shall be strictly limited to cases of an emergency call. (2) Location information sufficiently detailed to dispatch personnel and resources shall only be provided to the PSAP handling the emergency call. 
Supporting
Organizations
Norwegian P & T Authority, FICORA, Deutsche Telekom AG, OFCOM (CH), BNetzA, LITHUANIAN STANDARDS BOARD, ANCOM 

 

Keywords Projects Clusters Frequencies Mandates Directives
  EMERGENCY
LOCATION
VoIP
  Content delivery
Networks
Public Safety
  M/493
 
Official Journal
     
Remarks
2014-12-18 bonardi A new draft is uploaded - V 1.0.5 with status: Final draft for approval
2014-12-17 bonardi A new draft is uploaded - V 1.0.4 with status: Stable draft
2014-12-08 bonardi A new draft is uploaded - V 1.0.3 with status: Stable draft
2014-10-31 bonardi Draft contributed - V 1.0.2 contributed for Decision in E2NA(14)000191 as Stable draft
2014-10-31 bonardi A new draft is uploaded - V 1.0.2 with status: Stable draft
2014-10-31 tschang A new draft is uploaded - V 0.0.30 with status: Stable draft
2014-03-27 bonardi Draft contributed - V 0.0.29 contributed for Information in E2NA(14)000066 as Final draft for approval
2014-03-27 bonardi Draft contributed - V 0.0.29 contributed for Decision in E2NA(14)09_008r1 as Final draft for approval
2014-03-27 bonardi A new draft is uploaded - V 0.0.29 with status: Final draft for approval
2014-03-27 bonardi Final draft for approval proposal in contribution E2NA(14)09_008 was Revised by E2NA
2014-03-12 compans Draft contributed - V 0.0.28 contributed for Decision in E2NA(14)09_008 as Final draft for approval
2014-03-12 bonardi A new draft is uploaded - V 0.0.28 with status: Final draft for approval
2014-02-13 compans End of pre-processing proposal in contribution E2NA(14)000030 was Noted by E2NA (see RC E2NA(14)DEC011)
2014-01-22 compans Draft contributed - V 0.0.27 contributed for Decision in E2NA(14)000030 as Final draft for approval
2014-01-21 bonardi A new draft is uploaded - V 0.0.27 with status: Final draft for approval
2014-01-21 bonardi A new draft is uploaded - V 0.0.26 with status: Stable draft
2014-01-16 bonardi A new draft is uploaded - V 0.0.25 with status: Stable draft
2013-12-19 bonardi A new draft is uploaded - V 0.0.24 with status: Stable draft
2013-12-12 bonardi A new draft is uploaded - V 0.0.23 with status: Stable draft
2013-12-09 bonardi A new draft is uploaded - V 0.0.22 with status: Stable draft
2013-11-20 bonardi A new draft is uploaded - V 0.0.21 with status: Stable draft
2013-10-28 bonardi A new draft is uploaded - V 0.0.20 with status: Stable draft
2013-10-02 bonardi Status updated - V 0.0.19 with status: Early draft
2013-09-24 bonardi A new draft is uploaded - V 0.0.19 with status: Stable draft
2013-07-22 compans A new draft is uploaded - V 0.0.18 with status: Stable draft
2013-04-23 compans Early draft proposal in contribution E2NA(12)000014 was Noted by E2NA
2013-04-23 compans Early draft proposal in contribution E2NA(13)000007 was Noted by E2NA
2013-03-25 compans Draft contributed - V 0.0.13 contributed for Information in E2NA(13)000041 as Early draft
2013-03-25 henschel A new draft is uploaded - V 0.0.13 with status: Early draft
2013-03-11 henschel A new draft is uploaded - V 0.0.12 with status: Early draft
2013-01-15 henschel Draft contributed - V 0.0.11 contributed for Discussion in E2NA(13)000007 as Early draft
2013-01-15 henschel A new draft is uploaded - V 0.0.11 with status: Early draft - with comment: This is the corrected output draft of the meeting M_493_8
2012-12-18 henschel A new draft is uploaded - V 0.0.10 with status: Early draft - with comment: This draft contains the additional text agreed at the M493_8 meeting.
2012-11-12 henschel Draft contributed - V 0.0.9 contributed for Discussion in E2NA(12)000014 as Early draft
2012-11-12 henschel A new draft is uploaded - V 0.0.9 with status: Early draft
2012-11-06 schmidth A new draft is uploaded - V 0.0.8 with status: Early draft
2012-09-20 compans V 0.0.7 contributed in TISPAN(12)000058 as Early draft
2012-09-19 henschel V 0.0.7 contributed in TISPAN(12)000057 as Early draft
2012-09-19 henschel A new draft is uploaded - V 0.0.7 with status: Early draft
2012-08-10 henschel V 0.0.6 contributed in TISPAN(12)000048 as Early draft
2012-08-10 henschel A new draft is uploaded - V 0.0.6 with status: Early draft - with comment: Input Draft to M_493_5 Meeting
2012-01-17 henschel V 0.0.4 contributed in TISPAN(12)000003 as Early draft
2012-01-16 henschel A new draft is uploaded - V 0.0.4 with status: Early draft - with comment: Changes to be discussed and decided at M493_1
2011-12-06 compans A new draft is uploaded - V 0.0.3 with status: Early draft
 
  Displaying Item 1 of 4...

ETSI Home Page Any comments or problems with this application? Please let us know...