2024-03-28 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RTS/INT-00028-3' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
RTS/INT-00028-3 (PDF Format) Download standrd ref:
RTS/INT-00028-3 (Word Format) Download standrd ref:
RTS/INT-00028-3 (Zip Format)
  RTS/INT-00028-3 TS 186 007-3 406 INT
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2012-01-23) 3.1.1 2012-01-23   2009-10-01
  Rapporteur Technical Officer Harmonised Standard
  Peter Schmitting Helene Schmidt No
 
Title IMS Network Testing (INT); Communication HOLD (HOLD) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Testing; Part 3: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) proforma specification
CH using IP Multimedia Core Network subsystem; ATS&PIXIT 
Scope and Field
of Application
New document Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) to test the Communication Hold simulation service as specified in “Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; Communication Hold (CH) using IP Multimedia (IM) Core Network (CN) subsystem); Protocol specification (3GPP TS 24.610 Release 8)” 
Supporting
Organizations
Deutsche Telekom, Telekom Austria, Sintesio, Iskratel, Telecom Italia, Testing Technologies.  

 

Keywords Projects Clusters Frequencies Mandates Directives
  ATS
HOLD
IMS
PIXIT
SIP
TESTING
TTCN
3GPP-Release-8
NGN-R2
Interoperability
     
Official Journal
     
Remarks
2011-12-06 helene schmi Final draft for approval proposal in contribution INT(10)0143r3 was Accepted by INT
2011-10-27 schmitting V 3.0.4 contributed in INT(10)0143r3 as Final draft for approval
2011-10-27 schmitting Final draft for approval proposal in contribution INT(10)0143r2 was Revised by INT
2011-10-27 schmitting A new draft is uploaded - V 3.0.4 with status: Final draft for approval
2011-05-18 schmitting A new draft is uploaded -
2010-11-15 schmitting A new draft is uploaded -
2010-10-27 schmitting A new draft is uploaded -
2009-10-01 schmidth TD INT06_020r1.
 
Displaying Item 9 of 30...

ETSI Home Page Any comments or problems with this application? Please let us know...