0 Work Programme - EWP on the Web - Query Result
2019-08-18 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help
All Active Work Items For Current Status: From 'Creation of WI by WG/TB' Up to 'End of TB approval process'
View As Work Item Plan  |  View As Work Item Progress Report
  Found 691 Items...
Displaying items 1 to 10 ...
  IDENTIFICATION TITLE STATUS
1
Doc. Nb. GR ZSM 005 Ver. 0.1.2
Ref. DGR/ZSM-005ed111_Autom
Technical Body: ZSM
Details and Download
Zero-touch network and Service Management (ZSM);
Means of Automation

Means of Automation
Drafting Stage
Current Status:
Early draft (2019-06-02)
Next Status:
Stable draft (2019-09-13)
2
Doc. Nb. GS ZSM 001 Ver. 0.11.0
Ref. DGS/ZSM-001ed111_UCs
Technical Body: ZSM
Details and Download
Zero-touch network and Service Management (ZSM);
Requirements based on documented scenarios

Use Cases & Rqmts
Drafting Stage
Current Status:
Final draft for approval
(2019-08-08)

Next Status:
TB approval (2019-08-16)
3
Doc. Nb. GS QKD 013 Ver. 0.0.2
Ref. DGS/QKD-0013_TransModChar
Technical Body: QKD
Details and Download
Quantum Key Distribution (QKD)
Characterisation of Optical Output of QKD transmitter modules

Transmitter module characterisation
Drafting Stage
Current Status:
Early draft (2018-06-04)
Next Status:
Stable draft (2019-03-15)
4
Doc. Nb. GS QKD 010 Ver. 0.0.1
Ref. DGS/QKD-0010_ISTrojan
Technical Body: QKD
Details and Download
Quantum Key Distribution (QKD)
Implementation security: protection against Trojan horse attacks in one-way QKD systems

Implementation security against Trojan horse
Drafting Stage
Current Status:
Early draft (2017-12-01)
Next Status:
Stable draft (2019-02-15)
5
Doc. Nb. GS QKD 004 Ver. 1.2.4
Ref. RGS/QKD-004ed2_ApplIntf
Technical Body: QKD
Details and Download
Quantum Key Distribution (QKD);
Application Interface

QKD Application Interface
Drafting Stage
Current Status:
Stable draft (2019-02-19)
Next Status:
Final draft for approval
(2019-01-05)

6
Doc. Nb. GR OEU 032
Ref. DGR/OEU-0032
Technical Body: OEU
Details and Download
OEU
Life Cycle Analysis comparison between internal hosting solution and cloud hosting solution

Life Cycle Analysis comparison between internal hosting solution and cloud hosting solution
Drafting Stage
Current Status:
TB adoption of WI (2019-02-06)
Next Status:
Start of work (2019-01-16)
7
Doc. Nb. GR OEU 031
Ref. DGR/OEU-0031
Technical Body: OEU
Details and Download
OEU
Cost-Benefit Analysis of Ethernet and Power over Coax in IP Video Surveillance
Case Studies
Drafting Stage
Current Status:
TB adoption of WI (2019-02-06)
Next Status:
Start of work (2019-01-16)
8
Doc. Nb. GR OEU 030 Ver. 0.0.1
Ref. DGR/OEU-0030
Technical Body: OEU
Details and Download
OEU
Tests plan for IP and Power over Coax Plugtests

Tests plan for IP and Power over Coax Plugtests
Drafting Stage
Current Status:
Early draft (2018-12-18)
Next Status:
Stable draft (2019-04-30)
9
Doc. Nb. GS OEU 028
Ref. DGS/OEU-0028
Technical Body: OEU
Details and Download
OEU
Practical recommendations to improve collection and treatment of WEEE for the ICT Sector

Practical recommendations to improve collection and treatment of WEEE for the ICT Sector
Drafting Stage
Current Status:
Start of work (2018-06-22)
Next Status:
Early draft (2018-12-31)
10
Doc. Nb. GR OEU 027
Ref. DGR/OEU-0027
Technical Body: OEU
Details and Download
Operational energy Efficiency for Users (OEU);
Standard Request For Proposal (RFP) for intelligent mobility projects

Drafting Stage
Current Status:
Start of work (2018-06-13)
Next Status:
Early draft (2018-12-31)
  Found 691 Items...
Displaying items 1 to 10 ...

Display Items/Page


Warning: Displaying 691 work items on one page might take a lot of time!

ETSI Home Page Any comments or problems with this application? Please let us know...