2017-04-23 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help
All Active new Work Items For Current Status: From 'Creation of WI by WG/TB' Up to 'End of TB approval process'
View As Work Item Plan  |  View As Work Item Progress Report
  Found 44 Items...
Displaying items 1 to 10 ...
  IDENTIFICATION TITLE STATUS
1
New Work Item
Doc. Nb. GS MEC 002
Ref. RGS/MEC-0021TechReq
Technical Body: MEC
Details and Download
Mobile Edge Computing (MEC);
Phase 2: Use Cases and Requirements

Drafting Stage
Current Status:
Start of work (2017-03-09)
Next Status:
Early draft (2017-05-05)
2
New Work Item
Doc. Nb. EN 319 412-5
Ref. REN/ESI-0019412-5v221
Technical Body: ESI
Details and Download
Electronic Signatures and Infrastructures (ESI);
Certificate Profiles;
Part 5: QCStatements
Part 5: QCStatements
Drafting Stage
Current Status:
TB adoption of WI (2017-03-29)
Next Status:
Start of work (2017-03-16)
3
New Work Item
Doc. Nb. EN 302 194
Ref. REN/ERM-TG26-540
Technical Body: ERM TG26
Directives: 2014/53/EU
Details and Download
Navigation radar used on inland waterways;
Harmonised Standard covering the essential requirements of article 3.2 of Directive 2014/53/EU

Navigation radar used on inland waterways
Drafting Stage
Current Status:
TB adoption of WI (2017-04-07)
Next Status:
Start of work (2017-03-31)
4
New Work Item
Doc. Nb. TS 186 014-2
Ref. RTS/INT-00144-2
Technical Body: INT
Details and Download
Core Network and Interoperability Testing (INT);
Communication Diversion (CDIV) using IP Multimedia (IM) Core Network (CN) subsystem; 3GPPTM Release 12;
Part 2: Test Suite Structure and Test Purposes (TSS&TP)
Communication Diversion (CDIV); TSS&TP
Drafting Stage
Current Status:
TB adoption of WI (2017-04-07)
Next Status:
Start of work (2017-04-03)
5
New Work Item
Doc. Nb. TS 186 014-1
Ref. RTS/INT-00143-1
Technical Body: INT
Details and Download
Core Network and Interoperability Testing (INT);
Communication Diversion (CDIV) using IP Multimedia (IM) Core Network (CN) subsystem; 3GPPTM Release 12;
Part 1: Protocol Implementation Conformance Statement (PICS)
CDIV PICS
Drafting Stage
Current Status:
TB adoption of WI (2017-04-04)
Next Status:
Start of work (2017-04-03)
6
New Work Item
Doc. Nb. TS 186 010-2
Ref. RTS/INT-00145-2
Technical Body: INT
Details and Download
Core Network and Interoperability Testing (INT);
Conference (CONF) using IP Multimedia (IM) Core Network (CN) subsystem;Conformance test specification (3GPP Release 12);
Part 2: Test Suite Structure and Test Purposes (TSS&TP)
Conference (CONF) using IP Multimedia (IM) Core Network (CN) subsystem
Drafting Stage
Current Status:
TB adoption of WI (2017-04-04)
Next Status:
Start of work (2017-04-03)
7
New Work Item
Doc. Nb. TS 186 010-1
Ref. RTS/INT-00145-1
Technical Body: INT
Details and Download
Core Network and Interoperability Testing (INT);
Conference (CONF) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance test specification (3GPP Release 12);
Part 1: Protocol Implementation Conformance Statement (PICS)
Conference (CONF) using IP Multimedia (IM) Core Network (CN) subsystem
Drafting Stage
Current Status:
TB adoption of WI (2017-04-04)
Next Status:
Start of work (2017-04-03)
8
New Work Item
Doc. Nb. TS 186 007-2
Ref. RTS/INT-00146-2
Technical Body: INT
Details and Download
Core Network and Interoperability Testing (INT);
Communication HOLD (HOLD) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance test specification (3GPPTM Release 12);
Part 2: Test Suite Structure and Test Purposes (TSS&TP)
Communication HOLD (CH); (TSS&TP).
Drafting Stage
Current Status:
TB adoption of WI (2017-04-04)
Next Status:
Start of work (2017-04-03)
9
New Work Item
Doc. Nb. TS 186 007-1
Ref. RTS/INT-00146-1
Technical Body: INT
Details and Download
Core Network and Interoperability Testing (INT);
Communication HOLD (HOLD) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance test specification (3GPPTM Release 12);
Part 1: Protocol Implementation Conformance Statement (PICS)
Communication HOLD (HOLD) using IP Multimedia (IM) Core Network (CN) subsystem
Drafting Stage
Current Status:
TB adoption of WI (2017-04-04)
Next Status:
Start of work (2017-04-03)
10
New Work Item
Doc. Nb. TS 186 006-2
Ref. RTS/INT-00140-2
Technical Body: INT
Details and Download
Core Network and Interoperability Testing (INT);
Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR) using IP Multimedia (IM) Core Network (CN) subsystem;Conformance test specification (3GPP Release 12);
Part 2: Test Suite Structure and Test Purposes (TSS&TP)
OIP/OIR TSS&TP
Drafting Stage
Current Status:
TB adoption of WI (2017-04-04)
Next Status:
Start of work (2017-04-03)
  Found 44 Items...
Displaying items 1 to 10 ...

Display Items/Page


ETSI Home Page Any comments or problems with this application? Please let us know...