2018-06-25 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help
All Active Work Items For BRAN For Current Status: From 'Creation of WI by WG/TB' Up to 'End of pre-processing'
View As Work Item Plan  |  View As Work Item Progress Report
  Found 4 Items...
Displaying items 1 to 4 ...
 
  IDENTIFICATION TITLE (Formal & Working) STATUS
1
Doc. Nb. EN 302 567 Ver. 2.1.5
Ref. REN/BRAN-230018
Technical Body: BRAN
Directives: 2014/53/EU
Details and Download
Multiple-Gigabit/s radio equipment operating in the 60 GHz band;
Harmonised Standard for access to radio spectrum

HS 60 GHz Multiple-Gigabit/s equipment
Drafting Stage
Current Status:
Early draft (2018-06-21)
Next Status:
Stable draft (2018-09-21)
2
Doc. Nb. EN 302 502 Ver. 2.1.7
Ref. REN/BRAN-230014
Technical Body: BRAN
Directives: 2014/53/EU
Details and Download
Wireless Access Systems (WAS);
5,8 GHz fixed broadband data transmitting systems;
Harmonised Standard for access to radio spectrum
HS BFWA 5,8 GHz
Drafting Stage
Current Status:
Final draft for approval
(2018-06-19)

Next Status:
Draft receipt by ETSI Secretariat
(2018-04-13)

3
Doc. Nb. EN 301 893 Ver. 2.1.7
Ref. REN/BRAN-230016
Technical Body: BRAN
Directives: 2014/53/EU
Details and Download
5 GHz RLAN;
Harmonised Standard for access to radio spectrum

HS for 5 GHz RLANs
Drafting Stage
Current Status:
Early draft (2018-06-21)
Next Status:
Stable draft (2018-07-13)
4
Doc. Nb. EN 301 598
Ref. REN/BRAN-230019
Technical Body: BRAN
Directives: 2014/53/EU
Details and Download
White Space Devices (WSD);
Wireless Access Systems operating in the 470 MHz to 790 MHz TV broadcast band;
Harmonised Standard for access to radio spectrum
HS WAS 470 MHz to 790 MHz
Drafting Stage
Current Status:
TB adoption of WI (2018-04-06)
Next Status:
Start of work (2018-03-29)
  Found 4 Items...
Displaying items 1 to 4 ...
 
New Query

ETSI Home Page Any comments or problems with this application? Please let us know...