2024-03-29 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help
All Active Work Items For EE,EE 01,EE 02,EE EEPS For Current Status: From 'Creation of WI by WG/TB' Up to 'End of pre-processing'
View As Work Item Plan  |  View As Work Item Progress Report
  Found 31 Items...
Displaying items 1 to 10 ...
  IDENTIFICATION TITLE (Formal & Working) STATUS
1
Doc. Nb. EN 303 804 Ver. 0.0.3
Ref. DEN/EE-EEPS44
Technical Body: EE EEPS
Details and Download
Environmental Engineering (EE);
Energy efficiency metrics and measurement methods for data storage equipment

metrics and measurement methods for data storage
Drafting Stage
Current Status:
Early draft (2023-04-30)
Next Status:
Stable draft (2024-01-31)
2
Doc. Nb. EN 303 800-5 Ver. 0.0.22
Ref. DEN/EE-EEPS47-5
Technical Body: EE EEPS
Directives: 2009/125/EC
Details and Download
Environmental Engineering (EE);
Assessment of material efficiency of ICT network infrastructure goods (circular economy);
Part 5: server and data storage product disassembly and disassembly instruction
disassembly (TA-ITU:L.ME_DIS)
Drafting Stage
Current Status:
TB approval (2023-10-12)
Next Status:
Waiting - see "Remarks"
(2023-10-13)

3
Doc. Nb. EN 303 800-3 Ver. 0.0.17
Ref. DEN/EE-EEPS47-3
Technical Body: EE EEPS
Directives: 2009/125/EC
Details and Download
Environmental Engineering (EE);
Assessment of material efficiency of ICT network infrastructure goods (circular economy)
Part 3: server and data storage product availability of firmware and of security updates to firmware
availability of firmware and security updates to firmware (TA-ITU:L.ME_AF)
Drafting Stage
Current Status:
Final draft for approval
(2023-11-29)

Next Status:
WG approval (2024-06-16)
4
Doc. Nb. EN 303 800-2 Ver. 0.0.7
Ref. DEN/EE-EEPS47-2
Technical Body: EE EEPS
Directives: 2009/125/EC
Details and Download
Environmental Engineering (EE);
Assessment of material efficiency of ICT network infrastructure goods (circular economy)
Part 2: server and data storage product secure data deletion functionality
secure data deletion (TA-ITU:L.ME_DD)
Drafting Stage
Current Status:
Stable draft (2023-10-31)
Next Status:
Mature draft sent to EC and/or recog.Org
(2024-04-15)

5
Doc. Nb. EN 303 470 Ver. 1.1.5
Ref. REN/EE-EEPS42
Technical Body: EE EEPS
Details and Download
Environmental Engineering (EE);
Energy Efficiency measurement methodology and metrics for servers

Energy Efficiency measurement methodology and KPI/metrics for Servers (TA-ITU:L.EE_serv)
Drafting Stage
Current Status:
Early draft (2023-06-02)
Next Status:
Stable draft (2024-02-29)
6
New Work Item
Doc. Nb. EN 303 215
Ref. REN/EE-EEPS71
Technical Body: EE EEPS
Details and Download
Environmental Engineering (EE);
Measurement methods and limits for power consumption in broadband telecommunication networks equipment

update of ES 203 215 to insert new measurement method and transformation to EN
Drafting Stage
Current Status:
TB adoption of WI (2024-02-13)
Next Status:
Start of work (2024-03-01)
7
Doc. Nb. EN 301 605 Ver. 1.2.1
Ref. REN/EE-027014
Technical Body: EE 02
Details and Download
Environmental Engineering (EE)
Earthing and bonding of 400 VDC data and telecom (ICT) equipment

Earthing and bonding of 400 VDC
Drafting Stage
Current Status:
Early draft (2023-09-20)
Next Status:
Stable draft (2024-05-17)
8
Doc. Nb. EN 301 575 Ver. 1.2.3
Ref. REN/EE-EEPS67
Technical Body: EE EEPS
Details and Download
Environmental Engineering (EE);
Measurement method for energy consumption of Customer Premises Equipment (CPE)

Drafting Stage
Current Status:
Stable draft (2023-11-27)
Next Status:
Final draft for approval
(2024-05-15)

9
Doc. Nb. EN 300 253 Ver. 2.3.1
Ref. REN/EE-02108
Technical Body: EE 02
Details and Download
Environmental Engineering (EE);
Earthing and bonding of ICT equipment powered by -48 VDC in telecom and data centres

Earthing and bonding
Drafting Stage
Current Status:
Early draft (2023-09-20)
Next Status:
Stable draft (2024-02-12)
10
Doc. Nb. EN 300 132-2 Ver. 2.7.2
Ref. REN/EE-02109
Technical Body: EE 02
Details and Download
Environmental Engineering (EE);
Power supply interface at the input of Information and Communication Technology (ICT) equipment;
Part 2: -48 V Direct Current (DC)
Power supply interface at the input to ICT equipment (-48VDC)
Drafting Stage
Current Status:
Early draft (2023-12-14)
Next Status:
Stable draft (2024-02-23)
  Found 31 Items...
Displaying items 1 to 10 ...

Display Items/Page

New Query

ETSI Home Page Any comments or problems with this application? Please let us know...