2026-11-12 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help
All Active Work Items of Type 'EN', 'ES', 'EG' For Current Status: From 'Early draft' Up to 'Final draft endorsed by the Working Group'
View As Work Item Plan  |  View As Work Item Progress Report
  Found 164 Items...
Displaying items 1 to 10 ...
  IDENTIFICATION TITLE (Formal & Working) STATUS
1
Doc. Nb. EN 319 615 Ver. 1.4.2
Ref. REN/ESI-0019615v151
Technical Body: ESI
Details and Download
Electronic Signatures and Trust Infrastructures (ESI);
Trusted lists;
Procedures for using and interpreting European Union Member States national trusted lists
STF705 D6.12 Use of information within a trusted list, Make TS 119 615 an EN
Drafting Stage
Current Status:
Final draft (2026-06-01)
Next Status:
Final draft endorsed by the Technical Group
(2027-01-15)

2
Doc. Nb. EN 319 612 Ver. 2.4.3
Ref. REN/ESI-0019612v251
Technical Body: ESI
Details and Download
Electronic Signatures and Trust Infrastructures (ESI);
Trusted Lists

STF705 D6.11 Trusted Lists, Make TS 119 612 an EN
Drafting Stage
Current Status:
Stable draft (2026-06-02)
Next Status:
Final draft (2026-12-01)
3
Doc. Nb. EN 319 602 Ver. 1.1.8
Ref. REN/ESI-0019602v121
Technical Body: ESI
Details and Download
Electronic Signatures and Trust Infrastructures (ESI);
Lists of Trusted Entities;
Data model
STF705 D6.13 Lists of Trusted Entities, Make TS 119 602 an EN
Drafting Stage
Current Status:
Final draft (2026-11-09)
Next Status:
Final draft endorsed by the Technical Gr
(2026-10-15)

4
Doc. Nb. EN 319 532-4 Ver. 1.3.2
Ref. REN/ESI-0019532-4v141
Technical Body: ESI
Details and Download
Electronic Signatures and Trust Infrastructures (ESI);
Registered Electronic Mail (REM) Services;
Part 4: Interoperability profiles
REM Part 4: Interoperability profiles
Drafting Stage
Current Status:
Early draft (2026-09-30)
Next Status:
Stable draft (2026-12-22)
5
Doc. Nb. EN 319 532-3 Ver. 1.3.2
Ref. REN/ESI-0019532-3v141
Technical Body: ESI
Details and Download
Electronic Signatures and Trust Infrastructures (ESI);
Registered Electronic Mail (REM) Services;
Part 3: Formats
REM Part 3: Formats
Drafting Stage
Current Status:
Early draft (2026-09-30)
Next Status:
Stable draft (2026-12-22)
6
Doc. Nb. EN 319 532-2 Ver. 1.1.2
Ref. REN/ESI-0019532-2v121
Technical Body: ESI
Details and Download
Electronic Signatures and Trust Infrastructures (ESI);
Registered Electronic Mail (REM) Services;
Part 2: Semantic contents
REM Part 2: Semantic Contents
Drafting Stage
Current Status:
Early draft (2026-09-30)
Next Status:
Stable draft (2026-12-22)
7
Doc. Nb. EN 319 532-1 Ver. 1.1.2
Ref. REN/ESI-0019532-1v121
Technical Body: ESI
Details and Download
Electronic Signatures and Trust Infrastructures (ESI);
Registered Electronic Mail (REM) Services;
Part 1: Framework and architecture
REM. Part 1: Framework and architecture
Drafting Stage
Current Status:
Early draft (2026-09-30)
Next Status:
Stable draft (2026-12-22)
8
Doc. Nb. EN 319 522-4-3 Ver. 1.1.6
Ref. REN/ESI-0019522-4-3v121
Technical Body: ESI
Details and Download
Electronic Signatures and Trust Infrastructures (ESI);
Electronic Registered Delivery Services;
Part 4: Bindings; Sub-part 3: Capability/requirements bindings
STF705 D4.7 ERDS; Part 4: Bindings; Sub-part 3: capability/requirements binding
Drafting Stage
Current Status:
Final draft (2026-11-09)
Next Status:
Final draft endorsed by the Technical Group
(2026-10-15)

9
Doc. Nb. EN 319 522-4-2 Ver. 1.1.4
Ref. REN/ESI-0019522-4-2v121
Technical Body: ESI
Details and Download
Electronic Signatures and Trust Infrastructures (ESI);
Electronic Registered Delivery Services;
Part 4: Bindings; Sub-part 2: Evidence and identification bindings
STF705 D4.6 ERDS; Part 4: Bindings; Sub-part 2: evidence and identification b
Drafting Stage
Current Status:
Final draft (2026-11-08)
Next Status:
Final draft endorsed by the Technical Group
(2026-10-15)

10
Doc. Nb. EN 319 522-4-1 Ver. 1.2.5
Ref. REN/ESI-0019522-4-1v131
Technical Body: ESI
Details and Download
Electronic Signatures and Trust Infrastructures (ESI);
Electronic Registered Delivery Services;
Part 4: Bindings; Sub-part 1: Message delivery bindings
STF705 D4.5 ERDS; Part 4: Bindings; Sub-part 1: message delivery binding
Drafting Stage
Current Status:
Final draft (2026-11-08)
Next Status:
Final draft endorsed by the Technical Group
(2026-10-15)

  Found 164 Items...
Displaying items 1 to 10 ...

Display Items/Page

New Query

ETSI Home Page Any comments or problems with this application? Please let us know...